OO
72" from
gable panel s
OO
Fig. A
72" (182,9 cm )
from bottom of
gable panel to
top of ledger
boar d
39
4
PARTS REQUIRED:
3" (7,6 cm)
DOORS
Center doors on panel seam as shown
(Fig. B)
.
5
Check ledger board is still fush under panels.
Remove temporary supports and check doors open properly.
7
FINISH
8
You have finished installing your doors.
Screw hinge boards into wall supports and floor using four 3" screws as shown.
Make sure screws go into framing and foor
(Fig. C, D)
.
6
3" (7,6 cm)
Screws into the wall
support and foor frame.
Fig. B
SEAM
Fig. C
3/8"
(1 cm)
Fig. D
Angle 3" (7,6 cm)
Screw
Attach temporary support
OO
as a ledger board flush under wall
panels for doors to rest on, using three 3" screws
(Fig. A)
.
x7
OO
x1
1-1/2 x 2-1/2 x 69" (3,8 x 7,6 x 175,3 cm)
TEMPORARY SUPPORT