33
GABLE UNITS
PARTS REQUIRED:
Ensure gable panels are flush at peak of ladder and flush along top edge of
ladder assembly. Secure with 1-5/8" screws as shown
(Fig. E)
.
4
Arrange gable and ladder assemblies as shown (Fig. E). You will build 2 gable units.
Fig. E
x2
Gable Assemblies
Flush
Flush
Flush
1-5/8"
(4,1 cm)
Screws
Repeat STEP 4 to build the 2nd gable unit.
x2
Overhang Frames
FINISH
You have finished building (2) gable units.
x32
1-5/8" (4,1 cm)
Primed
side down