8' GABLE WALL 01 INSTALLATION
2" (5,1 cm)
x8
x2
x26
1-1/2" (3,8 cm)
PARTS REQUIRED:
3" (7,6 cm)
x4
2" (5,1 cm)
x4
2
Fig. D
Your walls are now installed.
FINISH
6"
(15,2 cm)
Nail lower edge of panels to floor
with 2" nails spaced 6" apart.
Angle nails into floor frame
(Fig. C)
.
Secure 12' wall panel to 8' wall stud with
1-1/2" nails spaced 6" apart.
Secure wall bottom plates to floor with 3" nails
.
Secure wall top plates with (1) 3" screw
at both corners, angled as shown
(Fig. D)
.
3
4
1-1/2"
(3,8 cm)
Nails
3" (7,6 cm)
Screw
Place 8' gable wall on floor, centered between installed walls.
Secure wall with (1) 2" screw through the eave wall panel into
8' wall bottom plate
(Fig. A)
and top plate
(Fig. B)
.
Secure wall to bottom plate first.
BEGIN
1
Flush
Flush
Flush
ENSURE PANEL CORNERS ARE FLUSH.
2"
(5,1 cm)
Screw
Fig. A
2"
(5,1 cm)
Screw
3" (7,6 cm)
Nails
3" (7,6 cm)
Screw
Fig. C
2"
(5,1 cm)
Nail
Angle nail to hit
foor frame.
6"
(15,2 cm)
6"
(15,2 cm)
OPTIONAL:
DOOR LOCATED
ON 12' EAVE WALL
STANDARD:
DOOR LOCATED
ON 8' GABLE WALL
Fig. B
2"
(5,1 cm)
Screw