92
Install all soffit boards with the primed side facing down.
PARTS REQUIRED:
EAVE SIDE SOFFITS (dormer side)
Starting in the middle of the eave framing, install
72-3/4"
soffit boards flush together
(Fig A)
.
Angle nails at center seam
(Fig. B)
.
Secure with 2" finishing nails as shown.
Ensure soffit boards are flush at rafter ends (Fig. C) and flush at seams
.
x2
3/8 x 5-7/8 x 72-3/4" (1 x 14,9 x 184,8 cm)
x18
2" (5,1 cm)
2
You have finished installing your eave side soffit boards.
FINISH
Fig. A
2" (5,1 cm) Finishing Nails
Flush
Fig. C
Flush
Fig. B
Angle nails
at seam