![background image](http://html1.mh-extra.com/html/backyard-products/gable-10-x-12/gable-10-x-12_manual_3345950021.webp)
77
33-3/8" x 75-1/4"
PARTS REQUIRED:
ROOF PANELS (Dormer Side)
2
1
BEGIN
Install the
33-38" x 75-1/4"
roof panel
as shown. Ensure panel is flush with
eave frame
(Fig. A)
and flush with
gable outer frame as shown.
Secure with 2" nails spaced
6" apart on edges and 12"
apart inside panel.
Repeat to install second
33-3/8" x 75-1/4"
panel.
Flush with
eave frame
Fig. A
33-3/8" x 75-1/4"
7-7/8" x 94-1/2"
▪ Roof panels may cause serious injury until securely fastened.
▪ Install all roof panels with the grid lines facing up (rough side).
7/16 x 33-3/8 x 75-1/4"
(1,1 x 84,8 x 191,1 cm)
x2
7/16 x 7-7/8 x 94-1/2"
(1,1 x 20 x 240 cm)
x1
Install the
7-7/8" x 94-1/2"
roof panel as shown.
Ensure panels is flush with eave frame
(Fig. A)
.
Secure with 2" nails spaced 6" apart.
The dormer-side roof panels are now installed.
FINISH
Flush
6"
(15,2 cm)
12"
(30,5 cm)
6"
(15,2 cm)