![background image](http://html1.mh-extra.com/html/backyard-products/16861-f/16861-f_assembly-manual_3344194005.webp)
3
COMPLETING YOUR SHED
You will need these additional materials:
OPTIONAL MATERIALS
DRIP EDGE ..................... 50 Feet
#15 ROOFING FELT
To cover 116 Sq. Ft. of roof area.
1" GALVANIZED ROOFING NAILS.........1/4 Lb
For roofing felt.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR
INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
3-TAB SHINGLES ............................ 5 Bundles
PAINT FOR SIDING .......................... 2 Gallons
Use 100% acrylic latex exterior paint. (2) coats recommended.
CAULK ................................................. 2 Tubes
Use acrylic latex exterior caulk that is paintable.
1" GALVANIZED ROOFING NAILS.... 3 Lbs
For shingles.
PAINT FOR TRIM .............................2 Quarts
Use 100% acrylic latex exterior paint.
You must caulk completely around window frame to
validate your warranty. Use a paintable exterior rated caulk.
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT!
This floor has been designed for general use. Depending on your specific use you may want to construct a heavy duty floor frame by
adding additional floor joists (shown below as shaded).
Below is a list of additional materials (not included):
x2
x8
2 x 4 x 8' (5 x 10 x 243,8 cm) Treated Lumber
Cut to (2) 2 x 4 x 89-5/8" (5 x 10 x 227,6 cm)
ea. 3" (7,6 cm) Hot Dipped Galvanized Nails
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
• This shed includes a floor.
• See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your floor,
as this will vary depending on your specific site.
Optional 12" (30,5 cm) spacing
Standard 16" (40,7 cm) spacing