![background image](http://html1.mh-extra.com/html/backyard-products/16861-f/16861-f_assembly-manual_3344194033.webp)
31
Flush
x1
x1
x12
1-1/2" (3,8 cm)
FRONT GABLE UNIT
PARTS REQUIRED:
FINISH
Your front gable unit is now assembled.
Flush
Flush
4-1/2" (11,4 cm)
4-1/2"
(11,4 cm)
2-1/2"
(6,3 cm)
Place left gable panel on parts
UU,
as shown. Secure with 1-1/2" nails, as shown.
1
BEGIN
2
Place right gable panel flush to left panel. Secure with 1-1/2" nails, as shown.
1-1/2" (3,8 cm)
Nails
1-1/2" (3,8 cm)
Nails
x2
2 x 4 x 9" (5,1 x 10,2 x 16,5 cm)
UU
UU (on flat)
Install all panels with the primed side facing up.