36
x4
19/32
x 2-1/2 x 22-5/8" (2,5 x 6,3 x 57,5 cm)
FA
BSL
x1
19/32 x 3-1/2 x 58-7/8" (2,5 x 8,9 x 149,5 cm)
x1
19/32 x 3-1/2 x 58-7/8" (2,5 x 8,9 x 149,5 cm)
BSR
Flush at peak
2" (5,1 cm)
Finishing Nails
BSL
BSR
Flush to top of OSB
roof panels
Flush to top of OSB
roof panels
2
Install
BSL
and
BSR
flush at rafter peak and flush to top of OSB roof panels.
Fasten trim with 2" finishing nails in pattern shown.
Repeat steps to install the back gable trim.
Install (4)
FA
projecting out past edge of OSB roof panels, two on each side of roof, as shown.
Fasten each with 2" finishing nails.
Do not sink nails completely.
Your front and back gable trim is now installed.
Remove temporary roof ledger boards.
FINISH
1
BEGIN
Flush trim up
to bottom of FA.
TEMPORARY
GABLE FASCIA - FRONT
x24
2" (5,1 cm)
PARTS REQUIRED:
TEMPORARY
Use FA as temporary ledger-boards to help install trim boards.
FA
Install all trim boards with the primed side facing out.