FRONT GABLE UNIT INSTALLATION
PARTS REQUIRED:
x2
3" (7,6 cm)
FINISH
Your front gable unit is now installed.
2
Working inside, secure gable unit connector
UU
with (2) 3" screws into nailer
OY
at an angle
(Fig. A)
.
BEGIN
1
NAIL FIRST
1-1/2"
(3,8 cm)
3/4"
(19,1 mm )
Measure and
Mark
3/4"
(19,1 mm )
Measure and
Mark
6"
(15,2 cm)
Fig. A
3" (7,6 cm)
Screws
UU
3
NAIL FIRST
1-1/2"
(3,8 cm)
Front Gable Unit
x40
1-1/2" (3,8 cm)
Continue nailing lower edge of panels into top plate with 1-1/2" nails spaced 6" apart.
Secure panels to rafter with 1-1/2" nails spaced 6" apart.
Measure 3/4" down from top plate and mark at each side as shown. Set gable unit on top plate.
Secure with (1) 1-1/2" nail on each side.
BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.