Phase Notes
• Assemble with hardware as shown.
Slide Attachment
Phase 18
Hardware needed:
• (3) BG - T-NUT 5/16 - H100074
• (3) CM - BOLT WH 5/16x1/2 - H100115
Parts needed:
• (1) SLIDE ASSEMBLY
Step 3: Attach the Slide Assembly to the
fort floor using hardware, as shown.
Step 1: Center the wave slide
assembly in the opening opposite the
swing beam assembly, as shown.
Step 2: Using a drill with a 5/16" bit,
drill (3) holes through the slide and
through the fort floor boards.
CM
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
SLIDE ASSEMBLY
1 7/16"
DRILLING DIAGRAM
2 3/4"
9"
12 3/4"
BG
CM
1"