Phase Notes
• Assemble with hardware as shown.
Step 1: Attach 'H4' Floor Brace
to 'M5' wall rails using Screws
'BT', as shown.
Parts needed:
• (1) H4 - FLOOR BRACE - W101631
• (2) H2 - FLOOR JOIST - W101521
• (4) H10 - FLOOR BRACE - W101534
• (2) F1 - ANGLE BRACE - W101630
Hardware needed:
• (4) BT - SCREW PFH 8x2-1/2 - H100090
• (4) N10 - BOLT WH 5/16x2-3/4 - H100015
• (8) AC - WASHER LOCK EXT 8x19 - H100030
• (4) AD - WASHER LOCK EXT 12x19 - H100031
• (4) D - NUT BARREL WH 5/16x7/8 - H100005
• (4) Z - LAG SCREW WH 5/16x2 - H100027
Step 3: Attach 'F1' Angle
Brace to 'H2' floor joist & 'E2'
fort upright using Lag Screw
'Z' & Washer 'AC', as shown.
Step 2: Attach 'H2' Floor Joist &
'H10' Floor Brace to 'E2' fort upright
using Bolt 'N10', Washer 'AC' & 'AD'
and Barrel Nut 'D', as shown. Repeat
this processin each of the remaining
three corners of the fort.
Note: It is vital that the fort
be level before and after
each phase of assembly.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
E1
E2
H10
H2
F1
H10
AC
Z
H10
M5
Z
AC
H2
F1
H2
D
AD
E1
H10
N
AC
BT
M13
H4
Fort Assembly
Phase 4