Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (2) H6 - WALL SLAT - W101535
• (2) EJ - L BRACKET GREEN - A100053
Hardware needed:
• (8) BQ - SCREW PFH 8x1-1/4 - H100087
• (4) BL - SCREW TAPPING 14x3/4 - H100083
Step 1: Attach 'H6' Wall Slat to 'M11'
wall rail using Screws 'BQ'. Secure
'EJ' L Bracket to 'H6' wall slats and
'M7' floor board using Screws 'BL',
as shown. Repeat process for
securing bottom of 'H6' wall rail on
the other side of fort.
Note: It is vital that the fort
be level before and after
each phase of assembly.
Step 2: Attach 'H6' Wall Slat to
'K2' arched wall rail using Screws
'BQ', as shown. Repeat process
for securing the top of 'H6' wall
rail on the other side of fort.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
Note: Do not overtighten screws, overtightening
may cause the screw to stick through the boards
and may cause sharp points. The head of the
screw should NOT sink into the wood for this
phase, it should be flush.
Note: Due to the changing size of the wood
as a result of moisture content, you may
need to adjust the spacing of your wall slats
1/16" to 1/8" when assembling walls. It would
be best to line up the boards on the wall
before attaching to estimate if a larger or
smaller gap is needed.
H6
K2
BQ
M11
H6
BQ
BL
EJ
M7
K2
Fort Assembly
Phase 7