TOP BEAM CONNECTING TUBE
(x2)
A4M01022
METAL BRACKET GREEN
(x4)
A4M01024
BOLT HEX M12x50mm WZ
M12x 50mm
(x6)
H100818
LOCK NUT WZ
M12
(x6)
H100819
NUT BARREL WH WZ
5/16x7/8
(x4)
H100499
BOLT CARRIAGE WZ
5/16x2 3/4
(x4)
H100811
BYD TAG STICKER (SMALL)
(x1)
A6P00375
NOTE:
ASSEMBLE SWING BEAM BY INSERTING
CONNECTING TUBES INTO SWING BEAM
TUBES & ALIGN THE HOLES AS YOU GO.
SWING BEAM END
(x2)
A4M01294
CENTER SWING BEAM
(x1)
A4M01293
ALIGN ALL HOLES AND ASSEMBLE USING
THE METAL BRACKETS AS SHOWN. THEN
CENTER & PLACE THE ID TAG IN THE
APPROXIMATE LOCATION SHOWN BELOW.
ATTACH QUICK LINKS TO DUCTILE
HANGERS AND INSTALL BOLTS AS SHOWN.
293
(x1)
MIDDLE TOP BEAM
294
(x2)
SWING TUBE, Y-SECTION
022
(x2)
TOP BEAM CONNECTING TUBE
499
(x4)
NUT BARREL - 7/8
024
(x4)
METAL BRACKET GREEN
811
(x4)
BOLT - 2 3/4
375
(x1)
BYD TAG STICKER (SMALL)
NOTE:
NOTE:
818
(x6)
BOLT - 50mm
819
(x6)
LOCK NUT - M12
040
(x6)
DUCTILE HANGER WITH INSERT WZ
242
(x6)
QUICK LINK (LONG) WZ
QUICK LINK (LONG) WZ
(x6)
H100242
STEP 2
DUCTILE HANGER WITH INSERT WZ
(x6)
A4M01040
17