3

CONCRETE FOUNDATION

If you choose to install your kit on a concrete slab refer to the diagram below.

A

B

C

4" (10,2 cm)

3-1/2"

(8,9 cm)

DOO

R

A

B

C

Actual Floor Size

Building Size

• A treated 2 x 4" (5,1 x 10,2 cm) sill plate is required when installing your shed on concrete. 

Hint: Use treated lumber in your kit or

   purchase full length treated lumber.

• Use a high quality exterior grade caulk beneath all sill plates.

• Fasten 2 x 4" (5,1 x 10,2 cm) sill  plates to slab using approved concrete anchors 

(fasteners not included)

.

• Check local code for concrete foundation requirements.

96" (243,8 cm)

85-5/8" (217,5 cm)

8'x 7'-8-5/8" (243,8 x 235,3 cm)

8'x 8' (243,8 x 243,8 cm)

92-5/8" (235,3 cm)

Treated Sill Plate

Caulk between sill plate 

and concrete.

2 x 4 x 8' (5,1 x 10,2 x 243,8 cm)

Requires:

x4

MUST be treated lumber.

Caulk

x1

      Allow new concrete slabs to cure for at least seven (7) days.

NOTES

Summary of Contents for GABLE 8' x 8'

Page 1: ...l our toll free number 1 888 827 9056 1 888 827 9056 or email customerservice backyardproductsllc com customerservice backyardproductsllc com Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM EST Saturday 8 30 AM to 4 30 PM EST November through March M F 8 00 AM to 5 00 PM EST ...

Page 2: ... This page intentionally left blank ...

Page 3: ...g ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 7 CHECK ALL PARTS Inventory all parts listed on pages 5 6 Contact our Customer Service Team if any parts are missing or damage...

Page 4: ...tallation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A Safety Glasses Tape Measure Paint Tools Ladder Wood Glue Caulk Gun Ham...

Page 5: ...reated lumber Use a high quality exterior grade caulk beneath all sill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements 96 243 8 cm 85 5 8 217 5 cm 8 x 7 8 5 8 243 8 x 235 3 cm 8 x 8 243 8 x 243 8 cm 92 5 8 235 3 cm Treated Sill Plate Caulk between sill plate and concrete 2 x 4 x 8 5 1...

Page 6: ...x exterior paint WOOD GLUE Exterior Rated REINFORCED WOOD FLOOR FRAME OPTIONAL IMPORTANT The included oor has been designed for general use Depending on your speci c use you may want to construct a heavy duty oor frame by adding additional oor joists shown below as shaded Below is a list of additional materials not included x4 x20 2 x 4 x 8 5 1 x 10 2 x 243 8 cm Treated Lumber Cut to 2 x 4 x 93 5 ...

Page 7: ... 3 x 92 5 8 5 1 x 7 6 x 235 3 cm PM x2 2 x 3 x 96 5 1 x 7 6 x 243 8 cm PT x1 1 x 4 x 60 2 5 x 10 2 x 152 4 cm JF x4 x4 2 x 4 x 52 5 1 x 10 2 x 132 1 cm x6 CM 5 8 x 2 1 2 x 92 5 8 1 6 x 6 4 x 235 3 cm x2 1 x 3 x 55 2 5 x 7 6 x 137 2 cm x1 19 32 x 2 1 2 x 55 1 5 x 6 4 x 137 2 cm x1 2 x 3 x 34 5 1 x 7 6 x 86 4 cm x2 CI Part identi cation is stamped on some parts Check these locations for part stamp R...

Page 8: ... 6 x 182 9 cm x1 3 8 x 21 x 48 1 x 53 3 x 121 9 cm x1 3 8 x 21 x 48 1 x 53 3 x 121 9 cm x1 3 8 x 20 x 48 1 x 50 8 x 121 9 cm x1 3 8 x 20 x 48 1 x 50 8 x 121 9 cm x2 x2 5 7 8 x 96 14 9 x 243 8 cm 48 x 96 121 9 x 243 8 cm x1 LEFT DOOR x1 RIGHT DOOR ROOF PANELS x106 1 1 2 3 8 cm 6 Roof panels are 7 16 1 1 cm thick DOOR HARDWARE Not Actual Size FLOOR PANELS x1 x1 48 x 96 121 9 x 243 8 cm 44 5 8 x 96 1...

Page 9: ...esults and aiding in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE MATERIAL REQUIRED x2 4 x 4 x 8 10 2 x 10 2 x 243 8 cm Treated Lumber Fasteners for Frame to 4 x 4 3 Screws shown as one option Minimum 20 3 screws exterior grade Use only wood treated for ground contact and fasteners approv...

Page 10: ... cm 48 121 9 cm 24 60 9 cm 20 1 2 52 1 cm 72 182 8 cm 92 1 2 235 cm Flush at ends x24 HINT For easier nailing stand on frame FOR 10 x 12 SKIP TO PAGE 16 Center on marks Center on marks You have nished your oor frame Proceed to level and square frame BEGIN 1 Orient parts as shown on at surface Measure and mark each dimension from end of boards 2 Use two 3 nails at each mark FINISH 3 DOOR 8 ...

Page 11: ...r frame squareness by measuring diagonally across corners If the measurements are the same the frame is square The diagonal measurement will be approximately 133 5 16 338 6 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with one fastener at ends of each runn...

Page 12: ...the panel side to side until the top corner is ush to the oor frame Fig B Secure panel with two 2 nails in the corners 2 BEGIN 1 3 4 Continue attaching the panel using 2 nails 6 apart on edges and 12 apart inside panel Use a chalk line or use pre painted grid lines to nail into joists under panel Check the oor frame is square by measuring diagonally across the frame corners If the measurements are...

Page 13: ...side panel 5 8 x 44 5 8 x 96 1 6 x 113 3 x 243 8 cm Continue by installing 44 5 8 x 96 panel with rough side up painted grid lines 5 PARTS REQUIRED x1 6 96 243 8 cm 96 243 8 cm 44 5 8 113 3 cm Flush 12 30 5 cm 6 15 2 cm Flush Flush Grid lines UP x53 You have nished Installing your oor panels FINISH 7 DOOR 11 ...

Page 14: ...lling Áoor panels Re level if needed The Áoor should be used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls HINT IMPORTANT DOOR SIDEWALL SIDEWALL FRONTWALL BACKWALL DOOR ...

Page 15: ... oor Measure and mark from end of boards IMPORTANT You will build two walls the same Use two 3 nails at each mark 3 7 6 cm PARTS REQUIRED x20 2 5 1 cm x20 Center on marks HINT 3 7 6 cm Nails 2 5 1 cm Nails x10 2 x 3 x 67 3 8 5 1 x 7 6 x 171 1 cm CJ x2 2 x 3 x 92 5 8 5 1 x 7 6 x 235 3 cm PM 5 8 x 2 1 2 x 92 5 8 1 6 x 6 4 x 235 3 cm x2 PM CJ 13 ...

Page 16: ...e up as shown Ensure a 3 4 measurement along the wall stud and locate the panel to 1 1 2 above side wall frame Secure panel with two 2 nails in the corners Fig A 7 6 5 Nail the panel using 2 nails 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel ...

Page 17: ...as shown with primed side facing up Nail using 2 nails 6 apart on edges and 12 apart inside panel 8 6 15 1 cm 46 1 8 117 2 cm 12 30 2 cm To draw panels tight at seams angle nail Flush Carefully ip your side wall over Repeat STEPS 1 8 to assemble your second side wall You have nished building both of your side walls FINISH 9 ...

Page 18: ...2 6 4 cm 2 1 2 6 4 cm 34 86 4 cm 45 1 2 115 6 cm 45 1 2 115 6 cm 91 231 1 cm 1 1 2 3 8 cm Nail using two 3 nails at each connection 3 2 1 BEGIN 3 7 6 cm CI PS PARTS REQUIRED 2 3 7 6 cm Nails HINT x2 Center PS on CI on edge on oor as shown Orient CI on at using a gusset as a temporary spacer x1 GUSSET TEMPORARY SUPPORT ...

Page 19: ...cm Fig B Fig A Center PT on CI on edge on oor as shown Center CI on PS on at using a gusset as a temporary spacer Nail PT to CI using 2 3 Nails Fig A 3 7 6 cm BACK WALL FRAME Use 2 3 screws at middle connection Fig B 4 5 6 7 FINISH 8 You have nished building your back wall frame PARTS REQUIRED 3 7 6 cm x2 PS PT CI 2 3 7 6 cm Screws 2 3 7 6 cm Nails x2 x1 GUSSET TEMPORARY SUPPORT ...

Page 20: ...x1 Place LEFT panel on back frame as shown with primed side facing up BEGIN 2 3 1 Nail horizontal framing using 2 nails 6 apart on edges and 12 apart inside panel Nail vertical framing using 1 1 2 nails 6 apart on edges BACK WALL PANELS PARTS REQUIRED Primed side UP For squareness maintain 1 1 4 measurement along panel edges x11 1 1 2 3 8 cm 2 5 1 cm x11 ...

Page 21: ...HT panel on back frame as shown with primed side facing up and ush to panel 5 6 4 BACK WALL PANELS PARTS REQUIRED Primed side UP FINISH 7 You have nished installing your back wall panels Nail horizontal framing using 2 nails 6 apart on edges and 12 apart inside panel Nail vertical framing using 1 1 2 nails 6 apart on edges x11 1 1 2 3 8 cm 2 5 1 cm x11 ...

Page 22: ...6 x 33 cm RK Position RK on edge 2 1 2 from outside edge and 1 from bottom edge of LEFT wall panel Fig A Nail RK to wall panel using 3 2 Nails 3 2 1 Repeat step 1 2 for RIGHT wall panel Fig B You have nished building your back wall BEGIN FINISH 4 BACK WALL BOTTOM PLATES PARTS REQUIRED 2 5 1 cm x6 Fig A Fig B RK RK ...

Page 23: ... cm 69 1 2 176 5 cm 23 1 4 59 1 cm 23 1 4 59 1 cm PT KU KU FRONT WALL FRAME Orient parts on edge on oor as shown Nail using two 3 nails at each connection 2 1 BEGIN 3 7 6 cm PARTS REQUIRED HINT 2 x 3 x 96 5 1 x 7 6 x 243 8 cm x4 x1 PT x2 2 x 3 x 69 1 2 5 1 x 7 6 x 176 5 cm KU 21 2 3 Nails ...

Page 24: ...6 15 2 cm Flush Flush x2 Place LEFT panel on front wall frame as shown with primed side facing up Ensure panel has a 1 gap at bottom and is ush to inside edge BEGIN 2 3 1 Nail using 2 nails 6 apart Repeat steps 1 2 for RIGHT panel FRONT WALL PANELS 2 5 1 cm PARTS REQUIRED x36 Primed side UP Square 2 Nails 22 ...

Page 25: ...to front wall panel BEGIN 2 1 Nail using 2 nails 6 apart FRONT WALL TOP PLATE 2 5 1 cm PARTS REQUIRED x9 DS DS 1 x 3 x 55 2 5 x 7 6 x 137 2 cm x1 DS 23 Flush CENTER CENTER Use to maintain 3 8 overhang x1 GUSSET TEMPORARY SPACER ...

Page 26: ...ils 6 apart Angle nail to hit oor frame Fig A 3 Nail side wall bottom plate to oor using 8 3 nails Nail 2 3 nails between each stud through bottom plate 4 5 You have nished standing your side wall FINISH 92 1 2 235 cm 3 7 6 cm Screws Nail 2 nails Àrst Angle to nail into Áoor frame 2 5 1 cm Nail Fig A 3 Nails into bottom plate 1 2 5 cm 1 1 2 3 8 cm 96 243 8 cm 6 15 2 cm Flush Flush Center wall asse...

Page 27: ... oor using 3 3 nails Screw back wall upright to oor using 2 3 screws Fig B Nail back wall top plate to side wall using 2 3 nails Fig C Remove OO temporary brace Nail Back wall panel to side wall stud using 17 1 1 2 nails at 6 apart 3 4 5 6 3 Nails into bottom plate 6 15 2 cm Center wall assembly on Áoor R DOO Nail 2 nails Àrst Angle to nail into Áoor frame 2 5 1 cm Nail Fig A Flush 2 3 7 6 cm Nail...

Page 28: ...ng 8 3 nails Nail 2 3 nails between each stud through bottom plate 3 6 You have nished standing your back and side walls FINISH 3 Nails into bottom plate 6 15 2 cm 6 15 2 cm Center wall assembly on Áoor Nail 2 nails Àrst Angle to nail into Áoor frame 2 5 1 cm Nail Fig A Flush 2 3 7 6 cm Nails 17 1 1 2 3 8 cm Nails Fig B Nail back wall top plate to side wall using 2 3 nails Fig B 4 DOOR x17 1 1 2 3...

Page 29: ...alls using 26 1 1 2 nails 6 apart 3 6 You have nished standing your walls FINISH 6 15 2 cm Center wall assembly on Áoor 2 3 7 6 cm Nails Fig B Nail front wall top plate to side walls using 2 3 nails Fig B C Screw front wall uprights to oor using 1 3 Screw Angle screw into oor Fig D E 4 5 Fig C 1 2 5 cm Nail 2 nails Àrst Angle to nail into Áoor frame 2 5 1 cm Nail Fig A 3 7 6 cm Screw Fig E Fig D x...

Page 30: ...own Repeat steps 1 4 to build two more assemblies Flip over rafter assembly and glue and nail gusset to back side Contact at peak 5 4 2 3 BEGIN 1 PARTS REQUIRED 2 x 4 x 54 5 1 x 10 2 x 137 2 cm 6 x 24 15 2 x 61 cm x6 x6 x72 CM Place two rafter halves CM in corners of back wall You will assemble 3 rafters 96 243 8 cm Use OO as Temporary Support CM OO x1 2 x 3 x 69 5 1 x 7 6 x 175 3 cm TEMPORARY SUP...

Page 31: ...from outside of panels Screw into top plate 2 3 7 6 Screws Fig A Fig B Locate rafters directly over the wall studs Secure with two 3 screws angled at each end Fig B NOTE use two screws at siding seam Screw through panel into end of rafter with 2 screw Fig A Check you have the measurements shown 1 FINISH 4 You have nished installing your rafters BEGIN 2 3 2 5 1 cm Screw 2 5 1 cm x6 ...

Page 32: ... gable panel ush to right panel on BV with a 1 overhang on bottom Nail using 4 1 1 2 Nails Place BV on at on oor 2 3 You have nished building your back wall gable panels FINISH 4 BEGIN 1 BACK WALL GABLE PANELS PARTS REQUIRED 2 x 3 x 17 1 2 5 1 x 7 6 x 44 5 cm x1 x1 x1 BV 1 1 4 3 2 cm 1 1 4 3 2 cm 1 2 5 cm 2 1 2 6 3 cm 6 15 2 cm 6 15 2 cm BV x17 1 1 2 3 8 cm Primed side UP ...

Page 33: ... on back wall top plate overlapping back wall panels 2 3 You have nished installing your back wall gable panels FINISH 4 BEGIN 1 BACK WALL GABLE PANELS PARTS REQUIRED BACK WALL 6 15 2 cm 2 5 1 Nails Flush Center gable panel assembly on back wall LEVEL LEVEL 2 5 1 cm x18 2 3 7 6 cm Screws 2 3 7 6 cm Screws Fig A PRE ASSEMBLED x2 ...

Page 34: ...t on oor as shown 2 3 You have nished building your Front wall gable panels FINISH 4 BEGIN 1 FRONT WALL GABLE PANELS PARTS REQUIRED x1 1 1 4 3 2 cm 1 1 4 3 2 cm 3 4 1 9 cm 3 4 1 9 cm 1 1 2 3 8 cm 2 1 2 6 3 cm 6 15 2 cm 5 12 7 cm 6 15 2 cm 2 5 1 cm x4 x1 2 x 3 x 6 5 1 x 7 6 x 15 2 cm x1 2 x 3 x 5 5 1 x 7 6 x 10 2 cm 3 8 x 19 5 8 x 48 1 x 49 8 x 121 9 cm 3 8 x 19 5 8 x 48 1 x 49 8 x 121 9 cm Flush x...

Page 35: ... on front wall top plate overlapping front wall panels 2 3 You have nished installing your back wall gable panels FINISH 4 BEGIN 1 FRONT WALL GABLE PANELS PARTS REQUIRED 2 5 1 cm Nails 2 5 1 cm Nails 2 5 1 cm Nails Flush Center gable panel assembly on front wall LEVEL LEVEL 2 5 1 cm x18 2 3 7 6 cm Screws 2 3 7 6 cm Screws Fig A x2 DS 6 15 2 cm PRE ASSEMBLED ...

Page 36: ... panel Fig A using 2 2 5 1 cm nails as shown Repeat steps 1 3 to attach trim to all four corners Finish attaching trim ush to corners Fig B using 7 2 5 1 cm nish nails as shown You have attached your fascia trim 4 3 2 72 182 9 cm 71 180 3 cm Flush under gable panel x4 x4 3 8 x 1 3 4 x 71 1 x 4 4 x 180 3 cm 3 8 x 1 3 4 x 72 1 x 4 4 x 182 9 cm Seam is Áush Caulk seam before painting trim Fig A ...

Page 37: ...e CL ush to front panel edge and center on right edge of groove Fig A Attach trim with eight 1 1 4 screws from inside Position second CL ush to panel edge and ush to CL already attached Fig A Attach trim with 10 1 1 4 screws from inside Repeat steps 1 2 to attach the back trim You have attached your upper trim 2 3 BEGIN 1 Fig A Flush 35 IF YOU DO NOT HAVE THE DELUXE PACKAGE CONTINUE TO PAGE 43 Flu...

Page 38: ...l rst You will use the panels long edge as a lever to bring your roof into square Commonly known as racking Roof panels may cause serious injury until securely fastened Attach the 48 x 96 panel with the rough side up painted grid lines side with a 1 2 measurement on the gable trim Fig A and the panel ush at the peak Fig B Secure panel with two 2 nails in the corners 1 BEGIN Two Nails 48 121 9 cm 1...

Page 39: ...and 12 apart inside panel Fig F 3 Attach the lower roof panel ush to the upper panels and with a 1 2 measurement at the gable trim Fig G Nail the roof panel using 2 nails 6 apart on edges and 12 apart inside panel Repeat process to attach roof panels on the opposite side 4 12 30 5 cm 6 15 2 cm Fig F 5 7 8 14 9 cm 96 243 8 cm 1 2 1 3 cm Gable Trim Flush Fig G PARTS REQUIRED 2 5 1 cm x86 23 58 4 cm ...

Page 40: ...RS 1 1 4 3 2 cm 2 5 1 cm Attach temporary supports OO and JF with 1 1 4 screws in middle and 2 screws at ends Tighten securely HINT Look for 3 8 SPACER attached to doors OO JF Make sure spacer is attached Tighten screws securely OFFSET Screw at ends 2 5 1 cm Bottom edges Áush Screw in middle 1 1 4 3 2 cm 3 8 1 cm 3 8 1 cm 3 8 1 cm 3 8 1 cm OFFSET GREEN RED x4 x4 x1 OO 2 x 3 x 69 5 1 x 7 6 x 175 3 ...

Page 41: ...s and oor at each corner of door frame using 4 3 screws as shown Continue to secure frame using 6 2 screws Make sure screws go into framing and Áoor Fig D E 4 3 7 6 cm Screws into four corners of wall 2 5 1 cm Screws into middle of wall Fig B Center 3 8 on panel seam Fig D Fig C 3 8 1 cm Fig E Angle 3 7 6 cm Screw Flush 72 182 9 cm from bottom of gable panel to top of ledger board Attach temporary...

Page 42: ...ove 3 8 spacers from doors Reinforce the door trim using 3 4 screws through door panel into trim Fig A Locate screws as shown in Fig B Use two screws at seams 3 4 1 9 cm ZJ Center 2 Nails x8 Fig B 14 35 6 cm Approximately Nail into framing Two Screws Two Screws Door Trim Hinge Board Fig A Door Panel ZJ You have nished securing your door and trim FINISH 3 BEGIN 2 1 2 5 1 cm ...

Page 43: ... 5 1 x 7 6 x 175 cm x2 2 5 1 cm DOOR WEATHERSTRIP OO FINISH 5 On right door center OO vertically in door opening Fig A OO will offset the right door 1 IN from the door trim Fig C 3 Secure OO using seven 3 screws through outside trim into OO Fig C 4 OO Screws 2 5 1 cm x12 1 2 5 cm OFFSET Screws 2 5 1 cm 1 2 5 cm OFFSET Secure OO using seven 3 screws through outside trim into OO Fig B 2 Fig A Fig B ...

Page 44: ...tions for bolts to extend into HINT Extend bolts to leave marks in wood Tap bolts with hammer Drill 3 8 holes deep enough for each bolt to slide into 3 2 Mount one barrel bolt ush at top of OO on left door using 3 4 screws as shown Fig A Mount the second barrel bolt ush at bottom of OO on left door using 3 4 screws as shown Fig B 1 HINT With door closed extend bolt and tap with hammer to leave a m...

Page 45: ...s shown Repeat step 2 for the 3 remaining horizontal door rails Install using 3 3 4 screws from inside of door Measure and mark side door trim 7 17 8 cm from top and bottom door trim 3 4 1 9 cm 7 17 8 cm 7 17 8 cm You have nished installing your horizontal door rails FINISH 4 BEGIN 2 3 1 BEA BEA ...

Page 46: ...for the 3 remaining decorative hinges Center decorative hinge on horizontal door rail and ush against door hinge 3 3 4 1 9 cm Screws You have nished installing your faux hinges FINISH 4 BEGIN 2 3 1 DOOR HINGES PARTS REQUIRED x4 x12 3 4 1 9 cm Hinge ...

Page 47: ... handle and set screw Measure and mark pre drill hole as shown 1 1 2 3 8 cm You have nished installing your door handle FINISH 6 BEGIN 2 3 4 5 1 1 1 2 3 8 cm 35 3 4 90 8 cm We suggest pre drilling with 1 4 drill Keep drilled hole square to trim to avoid breaking edge of 2x3 INSTALL ON RIGHT DOOR 1 1 2 3 8 cm TOP VIEW 1 4 Pre drill and 1 2 Drill through SET SCREW 2 1 1 2 3 8 cm x1 1 4 0 6 cm Drill ...

Page 48: ...d be ush to the roof panels Ensure the collar tie are level before nailing You have nished attaching your collar tie 2 x6 2 5 1 cm COLLAR TIES PARTS REQUIRED TECHO GLUE Install collar ties on middle rafter Flush JF HINT For best appearance install collar ties facing away from door x1 1 x 4 x 60 2 5 x 10 2 x 152 4 cm JF 46 ...

Page 49: ...47 FINISH 2 Caulk behind vent ange Position vent in opening as shown You have nished installing your vent x1 Level Caulk VENT PARTS REQUIRED BEGIN 1 ...

Page 50: ...ainting Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED Install over roof felt on gable side and under roof felt on eave side Fig A Do not use nails on side of drip edge that hangs over side of building Only nail top of drip ...

Page 51: ...across with lower edge of roof deck NOTE If you have installed drip edge install shingles ush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overhang or Áush with drip edge 4 Nails BACK OF SHED FRONT OF SHED NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS Familiarize yourself with a 3 Tab Shingle SHINGLE NAIL PATTERN 1 2 5 cm NAILS Sealing S...

Page 52: ...2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles ush at top of rst row s rain slots Ensure 1 overhang or ush to drip edge at front stagger each row 3 1 2 5 cm 1 2 5 cm BACK OF SHED FRONT OF SHED FRONT OF SHED Flush with rain slots Flush with rain slots Notch Notch ...

Page 53: ...erlap at ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut shingles along chalk line 5 7 6 9 8 SHINGLES continued If more than 5 to rain slot you must install another row of shingles 5 12 7 cm MAX Top...

Page 54: ... off pieces rst Score shingle then snap off angled cut Install rst ridge cap ush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm Top of slot Weather Seal Flush 1 Nail per side through weather seal 1 Nail per side through weather seal 5 12 7 cm FRONT OF SHED FRONT OF SHED Flush 20 to 22 Pieces ...

Page 55: ...Make sure there is 4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install ush to shingles 4 5 6 7 2 Nails per side You have nished your ridge cap FINISH 8 Flush to shingles Trim cap off Áush to shingles Cap ...

Page 56: ...nd faces of SmartSide and waferboard siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas Timber Buildings To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or timber building with an exterior grade wood preservative an exterio...