29
2.5. Mounting
Incorrect mounting can cause the PDU to become detached and fall down.
Persons may be injured and property damage may occur.
-
Handle the PDU with care and only mount it using the mounting
aids provided.
-
Never put a damaged PDU into operation or take it out of operation
immediately. Contact your dealer and arrange for repair.
-
Ensure that the connection cable and the cables of connected loads
are not kinked or pinched and that the insulation is not damaged.
-
Lay the cable away from hot surfaces.
-
Before connecting, check that the supplied cable length is sufficient
for the desired installation location.
-
During installation, route all cables so that they are protected
against mechanical damage.
2.6. Transport
During transport, the PDU may tip over or move. Persons may be injured and
property damage may occur.
-
Pack the PDU in the packaging so that it cannot move.
-
Secure the packaging so that it cannot move.
WARNING!
WARNING!
Summary of Contents for BlueNet BN2000
Page 1: ...1 BN2000 Montage und Installationsanleitung Mounting and installation instructions ...
Page 4: ...4 ...
Page 17: ...17 Konformität Approbation CE EN 62368 1 EMV Emission EN 55032 EMV Empfindlichkeit EN 55035 ...
Page 19: ...19 ...
Page 34: ...34 Conformity Approval CE EN 62368 1 EMV emission EN 55032 EMC sensitivity EN 55035 ...
Page 36: ...36 2 Mounting examples ...