MGS-250 Manual
6490-9000 Revision 4
29
Figure 13. Setting Network Termination Resistors
3.6. Conclusion
Once the base is mounted and all wiring is complete, align the gas
detector housing and press it onto the base. The gas detector will snap
into position, completing all electrical connections. Ensure the top and
bottom snap locks are engaged.
IMPORTANT:
If the right cable gland was not needed during
installation and wiring, be sure to install the blanking plug.
IMPORTANT:
Do not apply caulking or other material around
the gas detector base. The gas detector relies on air
exchange through the spaces between the base and the gas
detector housing. Do not obstruct the small gap around the
housing and the base with any material.