1
W W W . B A L T I M O R E A I R C O I L . C O M . A U
M A R 1 0 8 - 2
Table
of Contents
Construction Details
Warnings and Cautions
PART 1
Operation and Maintenance
5
Initial & Seasonal Start-Up
7
Extended Shutdown
PART 2
Detailed Component Maintenance Procedures
9
Cold Water Basin
10
Fan
11
Fan Drive System (Except Direct Drive Units)
13
Fan Drive System (Direct Drive)
14
Fan Motors
15
Fan Shaft Bearings
16
Locking collars
16
Fan Shaft
PART 2
Detailed Component Maintenance Procedures cont.
17
Access Door
18
Louvres and Eliminators
19
Water Distribution and Heat Transfer Section
20
Water Level Control
PART 3
Water Treatment
23
Bleed Rate
24
Bleed Line Calculations
PART 4
Corrosion and Scale Control
27
Corrosion and Treatments
28
Corrosion and Scale Control
30
Biological Control
PART 5
Factory Authorised Parts
33
The Perfect Fit
OPERATIONS & MAINTENANCE »
PCT
Summary of Contents for PCT Series
Page 1: ...OPERATION MAINTENANCE MANUAL PCT Cooling Towers ...
Page 2: ......
Page 8: ...PCT COOLING TOWER Operation and Maintenance INITIAL AND SEASONAL START UP EXTENDED SHUTDOWN 1 ...
Page 26: ...PCT COOLING TOWER Water Treatment BLEED RATE BLEED LINE CALCULATIONS 3 ...
Page 36: ...PCT COOLING TOWER Factory Authorised Parts THE PERFECT FIT 5 ...