22
Hot Water Basin Handrail for Multi-cell Units (Optional)
1. Follow the instructions for the hot water basin handrail installation on
Page 21
.
2. Secure the platform plates to the platform base at the gap between the cells using
5/16” tappers. See
Detail A
and
B
.
3. Secure the toe board gap plate using 5/16” tappers provided. See
Detail C
.
4. The welded handrail assemblies for the gap between cells drop into pre-installed
sockets. See
Figure D
below.
5. Secure the vertical handrail posts in each slot using the 3/8” bolts provided. See
Detail E
.
6. Connect the vertical handrail posts to each other using the 5/16” bolts provided. See
Detail F
.
Detail A
Detail B
Detail C
Detail D
Detail E
Figure 31
. Hot Water Basin Handrail for Multi-cell Units
Detail F
PET
PET
PDN
PEU
PES