INTEGRAL DENALI SERIES UPLIGHT

Surface Mount Installation

RELEASE DATE

08/02/2021

REFERENCE NUMBER

INS-2826-00

40429 Brickyard Drive • Madera, CA 93636 • USA

559.438.5800 • FAX 559.438.5900 

www.bklighting.com • [email protected]

B-K LIGHTING

IMPORTANT SAFETY INFORMATION LISTED ON REVERSE

READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS

5.  Align holes to final installation orientation. 

Arrows on temporary cover point towards 

screw location on faceplate for alignment 

purposes.

 

NOTE: Do not remove temporary cover until 

installation of faceplate.

Finished grade

8 3/4”

1.  Excavate trench according to designed lighting 

plan 15” deep and 12” wide suitable for the 

fixture housing. 

2.  Supply primary 120v, branch circuit wiring 

necessary for installation (by others).

3.  Slide stability flange onto housing.

 

NOTE: Product is supplied with a 

stability  flange to anchor fixture and aid in 

installation

.

4.  Loop minimum of 6” wire inside housing to 

allow for fixture service. Place fixture in hole.

 NOTE: 

 

Do not remove temporary cover! 

Soil Prep

Fixture Installation

6.  Per DIG-IT Guide, backfill the gap between 

the bottom of housing and bottom of hole with 

sand or pea gravel for drainage.

 

NOTE: The mounting collar must be flush to 

finished grade. Use stability flange to aid in 

installation as shown. Fixture is provided with 

5ft leads.

Stability Flange

Rebar or Stake (By Others)

Pea Gravel or Sand

Finished Grade

Conduit
trench

B.  Dig hole 15” wide and 12” deep.

Conduit

Trench

Excavated 

for Housing

C.  Prep soil according to DIG-IT Guide.

A.  Determine Soil Type by referencing DIG-IT 

Guide. Prep soil according to DIG-IT Guide.

In-Ground Installation Instructions

Screws on faceplate will 

align with alignment 

arrows on temporary 

cover

Finished grade

8 3/4”

2 window

faceplate 

shown

Finished grade

8 3/4”

LINE

12V

FIXTURE

COM

Remote

Transformer

COM

Optical opening on 

faceplate will align with 

alignment arrows on 

temporary cover

Optical opening on 

faceplate will align with 

alignment arrows on 

temporary cover

Stability flange

Rebar or stake (by others)

Pea gravel

Finished grade

Pavers

Stability flange

Rebar or stake (by others)

Pea gravel or sand

Finished grade

Finished grade

Wire nuts must 

clear opening

6” 

min.

Paver Sand

Soil

7.  Fill with soil, then compress. Layer paver 

sand as required for paver installation, then 

install pavers. Pavers may need to be cut to 

fit around housing.