INTEGRAL DENALI SERIES UPLIGHT
Surface Mount Installation
RELEASE DATE
08/02/2021
REFERENCE NUMBER
INS-2826-00
40429 Brickyard Drive • Madera, CA 93636 • USA
559.438.5800 • FAX 559.438.5900
www.bklighting.com • [email protected]
B-K LIGHTING
IMPORTANT SAFETY INFORMATION LISTED ON REVERSE
READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS
5. Align holes to final installation orientation.
Arrows on temporary cover point towards
screw location on faceplate for alignment
purposes.
NOTE: Do not remove temporary cover until
installation of faceplate.
Finished grade
8 3/4”
1. Excavate trench according to designed lighting
plan 15” deep and 12” wide suitable for the
fixture housing.
2. Supply primary 120v, branch circuit wiring
necessary for installation (by others).
3. Slide stability flange onto housing.
NOTE: Product is supplied with a
stability flange to anchor fixture and aid in
installation
.
4. Loop minimum of 6” wire inside housing to
allow for fixture service. Place fixture in hole.
NOTE:
Do not remove temporary cover!
Soil Prep
Fixture Installation
6. Per DIG-IT Guide, backfill the gap between
the bottom of housing and bottom of hole with
sand or pea gravel for drainage.
NOTE: The mounting collar must be flush to
finished grade. Use stability flange to aid in
installation as shown. Fixture is provided with
5ft leads.
Stability Flange
Rebar or Stake (By Others)
Pea Gravel or Sand
Finished Grade
Conduit
trench
B. Dig hole 15” wide and 12” deep.
Conduit
Trench
Excavated
for Housing
C. Prep soil according to DIG-IT Guide.
A. Determine Soil Type by referencing DIG-IT
Guide. Prep soil according to DIG-IT Guide.
In-Ground Installation Instructions
Screws on faceplate will
align with alignment
arrows on temporary
cover
Finished grade
8 3/4”
2 window
faceplate
shown
Finished grade
8 3/4”
LINE
12V
FIXTURE
COM
Remote
Transformer
COM
Optical opening on
faceplate will align with
alignment arrows on
temporary cover
Optical opening on
faceplate will align with
alignment arrows on
temporary cover
Stability flange
Rebar or stake (by others)
Pea gravel
Finished grade
Pavers
Stability flange
Rebar or stake (by others)
Pea gravel or sand
Finished grade
Finished grade
Wire nuts must
clear opening
6”
min.
Paver Sand
Soil
7. Fill with soil, then compress. Layer paver
sand as required for paver installation, then
install pavers. Pavers may need to be cut to
fit around housing.