background image

40429 Brickyard Drive • Madera, CA 93636 • USA

559.438.5800 • FAX 559.438.5900

www.bklighting.com • [email protected]

B-K LIGHTING

PROJECT:

TYPE:

3.  Mount fixture using two (2) #10-24 hex screw 

to installed back box. Do not over tighten.

Phase 2 - Finish Installation of Fixture with Transformer in Junction Box.

LINE

12V

FIXTURE

COM

Remote

Transformer

(by others)

COM

1.  Ground primary branch circuit to junction box 

per NEC. Remove #10-24 Stainless Steel Phillips 
screws from mounted back box. Install universal 
mounting ring (supplied with faceplate) using 
#10-24 screws onto back box. Align faceplate 
mounting holes to final mounting position.

2.  Make two connections from 12V transformer 

to LED source  leads (18 gauge wire) and two 
connections to primary branch cuircuit using 
proper wire connectors (By Others). 

Phase 1 - Rough In

Installation of Back box

1.  Install Conduit (by others) to be used with 

this product. 

2.  Install junction box so that front face is flush 

with finished wall or ceiling.

3.  Connect box to conduit and pull wires for 

connections (See Wiring diagram).

Additional Info

•  Please follow National and Local electrical codes for your area. 
•  4” round cast box is provided with Five (5) 1/2” threaded hubs 

for conduit entry (4 on sides and one on back of box). 

•  Suitable for through wire
•  Suitable for installation into combustible materials.
•  Rated for 90° C.

Please refer to the low voltage design guide at www.bklighting.com/

lvguide before installation for proper wire selection. 

IMPORTANT SAFETY INFORMATION LISTED ON REVERSE

READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS

3167387

ETL LISTED

CONFORMS TO ANSI/UL STANDARD 1838,

CERTIFIED TO CSA STD C22.2 NO.250.7 

CSA STD C22.2 TIL B-58A  

EC™/ ED™/ AS™/ SM-AR™

Architectural Surface Installation Instructions

PRELIMINARY

7-11-12

REFERENCE

 

NUMBER

INS000942

3.  Mount fixture using two (2) #10-24 hex screw 

to installed back box. Do not over tighten.

Phase 2 - Finish Installation of Fixture with Remote Transformer.

1.  Remove #10-24 Stainless Steel Phillips screws 

from mounted back box. Install universal 
mounting ring (supplied with faceplate) using 
#10-24 screws onto back box. Align faceplate 
mounting holes to final mounting position. 

2.  Make two connections from remote 12V 

transformer to LED source leads (18 gauge 
wire) using proper wire connectors (By 
Others).

TECHNOLOGY

with

Reviews: