Supplied By www.heating spares.co Tel. 0161 620 6677
CONTROL KNOB FITTING
To prevent damage to the PCB (1), the control knob (2)
and rubber sealing gasket (3) are packed within the liter-
ature bag and should be fitted during the installation of
the appliance.
To fit, with the front casing removed, simply place the
knob into the location hole on the thermostat (4), then fit
the rubber sealing gasket onto the control knob.
6
5. Removing four casing securing screws and washers
will allow casing to be removed.
6. Slide top casing cap upwards this will allow front
casing to slide forward.
7. With the front casing removed fit the three strain relief
bushes into base of back panel.
8. Fit pipe sealing grommet into top casing panel and cut
off end to allow pipe to slide through (see diagram)
IMPORTANT TOP CASING PANEL WITH GROMMET
MUST BE RE-FITTED BACK IN POSITION BEFORE
MAKING TOP PIPE CONNECTION.
9. When re-fitting casings slide front casing back into
position ensure small temperature adjuster on PCB
passes through the hole on the control panel. Slide the
top-casing panel down into position and secure panels
into position using the four screws.
FITTING PIPE SEAL
FITTING STRAIN
RELIEF BUSHES
TOP CASING
PIPE SEAL
FLOW PIPE
STRAIN RELIEF
BUSHES
FIG. 4
FIG. 5
VENTILATION REQUIREMENTS
If the appliance is to be fitted in a confined space or
compartment with a potential ambient temperature of 60°C
or above, it is strongly recommended that adequate
ventilation is provided to prevent the overheating of the
boiler controls. Aeration of 100cm
2
will be required to the
compartment, in both high and low level positions.