Page 12
INSTALLING STAIR RAILING WITH GLASS INFILL
FOR CLASSIC COMPOSITE SERIES AND RESERVE RAIL
4
5
• Using lengths in Step 3 as a reference, measure and cut Top and Bottom
Glass Channels, as well as both Rubber Gaskets at appropriate angle.
TRIM GLASS CHANNELS AND GASKETS
Pre-drill 7/64"
#8 x 3"
Semi-threaded
Screws
• Attach Mounting Brackets
to Top AND Bottom
Support Rails.
• Position Bottom Support Rail on the center of
the posts and secure Mounting Brackets to posts.
• Trim Foot Block and wedge under
Support Rail & Attach.
Pre-drill through
Bottom Support
Rail ONLY with
3/16" bit
Bottom Support
Rail
#8 x 3"
Coated
Screw
INSTALL BOTTOM SUPPORT RAIL
Pre-drill 7/64"
#8 x 3/4" Screws
Center screw
aligned with
rail centerline
Glass Channels must be at
least 4" shorter than rail.