background image

Page 2

INSTALLING RAILING WITH BALUSTERS 

FOR CLASSIC COMPOSITE SERIES AND RESERVE RAIL

NOTE: IF INSTALLING POST LIGHTING, WIRING MUST BE INSTALLED PRIOR TO 

SECURING POSTS TO DECK/STAIR SURFACE AND INSTALLING TOP RAILS.
It is the responsibility of the installer to meet all local code requirements and obtain all required 

building permits. The installer should determine and implement appropriate installation 

techniques for each installation situation. The AZEK Company or its reseller shall not be held 

responsible for improper or unsafe installations.

IMPORTANT NOTES:

•  Please read all instructions completely before starting any part of the installation. Always make sure to visit www.TimberTech.com to 

ensure you are viewing the most current installation instructions, care and cleaning, technical information and more.

•  TimberTech Railing should be installed using the same good building principles used to install wood or composite railing and in 

accordance with the local building codes and the installation guidelines included below.  

•  AZEK Co. LLC accepts no liability or responsibility for the improper installation of this product. 
•  TimberTech Railing may not be suitable for every application and it is the sole responsibility of the installer to be sure that TimberTech 

Railing is fit for the intended use. Since all installations are unique, it is also the installer's responsibility to determine specific 

requirements in regards to each Rail application. 

•  AZEK Co. LLC recommends that all applications be reviewed by a licensed architect, engineer or local building official before 

installation.  If you have any questions or need further assistance, please call AZEK Customer Service  at 877-ASK-AZEK (877-275-

2935) or visit our website at www.TimberTech.com. 

•  TimberTech Railing is tested as a whole system and should be used that way.  It is not intended to be used in  conjunction with other railing 

systems or fasteners. 

•  The following Installation Guidelines are applicable for installation of TimberTech Classic Composite Series and TimberTech Reserve 

Rail Systems.

•  IMPORTANT: Make sure the DRIVE TOOL/DRILL is configured or set to use the SCREW setting when driving and/or tightening 

all FASTENERS. It is very Important not to overdrive fasteners. The use of Impact type drill drivers can increase the risk of 

overdriving fasteners.

•  SAFETY: Always wear goggles when handling, cutting, drilling and fastening materials. 
•  Failure to install this product in accordance with applicable building codes and TimberTech's written Railing Install Guide may lead to 

personal injury, affect rail system performance and void the product warranty.

•  The buildup or generation of static electricity is a naturally occurring phenomenon in many plastic based products such as carpeting, 

upholstery, and clothing, and can occur on alternative decking under certain environmental conditions. This static electricity can 

discharge once contact is made with hardware, railing, or other conductors of electricity.

Find install videos, written 

instructions and a chat link at  

https://www.timbertech.com/

installation-help. 

Summary of Contents for TimberTech Classic Composite Series

Page 1: ... Railing with Glass Infill 11 TimberTech Reserve Rail can be installed with a continuous Top Rail in up to 16 lengths measured from the center of the end posts These applications require the use of a 4 Post Sleeve 4 Post Skirt and a 4 x4 Post as an intermediate post as well as unique fastening procedures This Install Guide details these unique procedures ...

Page 2: ...h Rail application AZEK Co LLC recommends that all applications be reviewed by a licensed architect engineer or local building official before installation If you have any questions or need further assistance please call AZEK Customer Service at 877 ASK AZEK 877 275 2935 or visit our website at www TimberTech com TimberTech Railing is tested as a whole system and should be used that way It is not ...

Page 3: ... post to center of post For all other applications consult a design professional or a TimberTech Railing representative for more information 4x4 lumber posts must be installed plumb and level with each other Cut slowly using a thin kerf finish saw blade to avoid chipping Read instructions completely to get an understanding of how the product goes together and how each piece affects the other For a...

Page 4: ... Sleeve 5 6 32 6 x 6 Post Sleeve 6 32 4 x 4 Post Sleeve 4 25 4 25 COMPONENTS NEEDED FOR INSTALLING ONE TIMBERTECH RAIL SECTION TOP RAIL NOT INCLUDED IN CLASSIC COMPOSITE SERIES Components available separately for mix and match rail systems Additional Components Needed for Each System Sold Seperately Top Rail Sold Seperately 1 Universal Bottom Rail with Classic Composite Series 2 Support Rails Hard...

Page 5: ...OR CLASSIC COMPOSITE SERIES AND RESERVE RAIL DIMENSIONAL CONSTRAINTS FOR STRAIGHT SECTION DIMENSIONAL CONSTRAINTS FOR STAIR SECTION Max of 63 Min 27 75 for 36 Min of 2 Max of 4 Min 27 75 for 36 Glass should be 1 4 thick Max of 63 Min of 2 Max of 4 ...

Page 6: ... sleeve will be slightly larger than the post Ensure posts are square and plumb Shim as needed to plumb Position template at bottom of post sleeve above post skirt Cut the Bottom Support Rail to length Add support blocks as required Attach brackets CUT AND ASSEMBLE BOTTOM SUPPORT RAIL Be sure to cut Post Sleeves such that finished rail height is at least 36 high for a 36 rail application and 42 hi...

Page 7: ... Universal Bottom Rails Top Support Rail and cut to length Measure and cut Top and Bottom Glass Channels and Rubber Gaskets to appropriate lengths Position Bottom Support Rail assembly onto Support Blocks Pre drill holes into post sleeves only Attach brackets with green coated screws 7 64 Pre drill 8 x 3 Semi threaded Screws 8 x 3 Semi threaded Screws Cut Rubber Gaskets with utility knife 5 Glass ...

Page 8: ...ANEL ASSEMBLE LOWER RAIL SECTION Apply Rubber Gasket to bottom of Glass Panel first Set panel gasket assembly into Bottom Glass Channel Place Universal Bottom Rail over Bottom Support Rail Install Bottom Glass Channel utilizing pre drilled holes Pre drill 7 64 8 x 1 Coated Screws Bottom Glass Channel Pre drilled holes are in channel ...

Page 9: ...ALL TOP GASKET AND TOP GLASS CHANNEL Align top Support Rail to center of Posts Attach Brackets to Top Support Rail Place Rubber Gasket on top of glass panel Fit Top Glass Channel onto glass panel assembly Top Glass Channel Pre drilled holes are on side 7 64 Pre drill 8 x 3 Semi threaded Screws 7 64 Pre drill 8 x 3 4 Screws ...

Page 10: ...terior grade caulk applied to the underside of the Cap Attach Top Rail using 2 1 4 coated screws driving screws up through Top Glass Channel into Top Rail 8 x 2 1 4 Coated Screws 3 16 Pre drill through existing holes in Top Glass Channel and through the Top Support Rail Caution Screws must be 2 1 4 to attach the Top Rail on the Straight Rail sections ...

Page 11: ...ils to check for accuracy Correct Incorrect 1 Optimal 39 INSTALL POST SLEEVES Trim Post Sleeves to desired length Slide Post Sleeves and Post Skirt over post do not force Post sleeve will be slightly larger than the post Ensure posts are square and plumb Shim as neeed to plumb Be sure to cut Post Sleeves such that finished rail height is at least 36 high for a 36 rail application and 42 high for a...

Page 12: ...7 64 8 x 3 Semi threaded Screws Attach Mounting Brackets to Top AND Bottom Support Rails Position Bottom Support Rail on the center of the posts and secure Mounting Brackets to posts Trim Foot Block and wedge under Support Rail Attach Pre drill through Bottom Support Rail ONLY with 3 16 bit Bottom Support Rail 8 x 3 Coated Screw INSTALL BOTTOM SUPPORT RAIL Pre drill 7 64 8 x 3 4 Screws Center scre...

Page 13: ...oles are in channel 7 64 Pre drill 8 x 1 Coated Screws 7 ASSEMBLE LOWER RAIL SECTION Place Universal Bottom Rail over Bottom Support Rail Install Bottom Glass Channel utilizing pre drilled holes ATTACH LOWER GASKET AND INSTALL GLASS PANEL Apply Rubber Gasket to bottom of Glass Panel first Set panel gasket assembly into Bottom Glass Channel 6 ...

Page 14: ...r Gasket on top of glass panel Fit Top Glass Channel onto glass panel assembly Top Glass Channel Pre drilled holes are on side INSTALL TOP SUPPORT RAIL Mark Ends of Top Support Rail Rotate Rail assembly out of way to fasten Support Block Secure Mounting Brackets to Posts Pre drill 7 64 8 x 3 Semi threaded Screws Pre drill 7 64 8 x 3 Semi threaded Screws ...

Page 15: ...POST CAPS Attach Top Rail using 3 coated screws driving screws up through Top Glass Channel into Top Rail Attach Post caps using exterior grade caulk applied to the underside of the cap 8 x 3 Coated Screws 3 16 Pre drill through existing holes in Top Glass Channel Screws must be 3 to attach the Top Rail on stair sections ...

Page 16: ...AZEK Building Products 1330 W Fulton Market Suite 350 Chicago IL 60607 REV 07 20 2020 AZEK Building Products All Rights Reserved TimberTech com ...

Reviews: