background image

AB-7050 

13 

Installation steps: Neosensor on Thermoplate with Thermoplate mounting kit 

1)  Attach the mounting plate of Thermoplate to the outlet box cover (JIS C8340:1999 Boxes and box covers for rigid metal 

conduits (mounting dimension: 83.5 mm)) on the mounting surface.  

2)  Attach the main unit of Thermoplate to the mounting plate. 

3)  Attach the Thermoplate mounting kit to the Thermoplate. 

4)  Connect the lead wires of Neosensor to the wires from the load. (See Figs. 20 and 21.) 

  Note: 

The number of the lead wires differs depending on the models. Note that the Pt100 temperature sensor model with modular connection 
has a modular jack instead of lead wires. (Model TY7043Z0P01(-1)) 

5)  Remove the cover of Neosensor as shown in Fig. 14. 

6)  Set the depth change levers on the bilateral sides of the Neosensor main unit to the upper position (indicated with "L" shown 

in Fig. 17). 

7)  Mount the main unit of Neosensor on the main unit of the Thermoplate mounting kit with four mounting screws (M3 

×

 16) 

supplied with Neosensor. 

8)  Attach the cover back to the Neosensor main unit and complete the installation. (See Fig. 14.) 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 12.  Installation: Neosensor with Thermoplate mounting kit (on Thermoplate) 

 

Wires 

from the load 

83.5 mm

Mounting plate of Thermoplate

2 pan-head machine screws (M4 

×

8)

of Thermoplate

Main unit of Thermoplate

2 pan-head machine screws (M4 

×

5) 

of Thermoplate

Main unit of 

Thermoplate mounting kit

2 tapping screws (M2.6 

×

 8) 

of Thermoplate mounting kit 

Lead wires of 
Neosensor 

Main unit of Neosensor 

4 flat-head machine screws  
(M3 

×

 16) of Neosensor 

Cover of Neosensor 

Neosensor 

Thermoplate mounting kit 

(optional) 

Thermoplate 

(optional) 

Mounting box cover 

(JIS C8340

with 83.5 mm mounting dimension,

commercially available)

Summary of Contents for HTY7043T1P00

Page 1: ...sing Neosensor is thus suitable for various applications such as commercial building air conditioning or other indoor uses Note The specification data of the two wire 4 20mA output model of Neosensor...

Page 2: ...bligatory action to prevent possible danger The symbol inside graphically indicates the actual action to be carried out For example the sign on the left indicates general instructions CAUTION Use the...

Page 3: ...ow Available model numbers Model number Type Power Humidity output Temperature output Signal output wire connection Company logo HTY7043T1P00 Yes HTY7043T1P00 1 Neosensor 24 V DC AC 1 5 VDC RTD Pt100...

Page 4: ...iring Thermoplate for open wiring is used for open wiring installation Part No DY2000A3021 For mounting three Neosensor crosswise Auxiliary device Multi Thermocase Model TY1100Z LAN cable Part No DY72...

Page 5: ...tion resistance Min 500 V DC 20 M Withstand voltage 500 V AC applied for 1 min with max of 1 mA leakage current between housing and terminals Environmental conditions Rated operating condition Limit o...

Page 6: ...tead of lead wires Model TY7043Z0P01 1 Figure 1 Mounting dimensions mm Neosensor with Wall direct mounting kit Neosensor high sensitive type Note For wiring secure more than 15 mm clearance inside the...

Page 7: ...unting surface when installing Neosensor with Thermoplate mounting kit 2 The number of lead wires differs depending on the models Note that the Pt100 temperature sensor model with modular connection h...

Page 8: ...th Thermoplate mounting kit Figure 5 Mounting dimensions mm Neosensor high sensitive type with Thermoplate mounting kit on Thermoplate Thermoplate mounting kit Figure 6 Dimensions mm Mounting plate of...

Page 9: ...sensor model with modular connection has a modular jack instead of lead wires Model TY7043Z0P01 1 Figure 7 Mounting dimensions mm Neosensor not covered with Multi Thermocase mounting kit Multi Thermoc...

Page 10: ...rated by office device or equipment for example stays on Air circulation is interfered by furniture or door for example Temperature and or humidity sensing is affected by draft downdraft and hot cold...

Page 11: ...14 5 Set the depth change levers on the bilateral sides of the Neosensor main unit to the upper position indicated with L shown in Fig 17 6 Mount the main unit of Neosensor on the main unit of the Wa...

Page 12: ...d with L shown in Fig 17 6 Mount the main unit of Neosensor on the main unit of the Wall direct mounting kit with four mounting screws M3 16 supplied with Neosensor 7 Attach the cover back to the Neos...

Page 13: ...on the bilateral sides of the Neosensor main unit to the upper position indicated with L shown in Fig 17 7 Mount the main unit of Neosensor on the main unit of the Thermoplate mounting kit with four...

Page 14: ...lled with its cover removed IMPORTANT Before installing Neosensor in the Multi Thermocase be sure to set the depth change levers on the bilateral sides of the Neosensor main unit at the lower position...

Page 15: ...pth change Raising the Neosensor main unit 3 Set the depth change levers located on the bilateral sides on the main unit front surface at the lower position The levers are factory set at the upper pos...

Page 16: ...ck Blue Black 24 V AC DC 1 5 V DC 0 10 V DC Power supply Humidity Models HY7043T1000 1 and HY7043T6000 1 Figure 22 Terminal wiring Humidity sensor with 1 5V 0 10V humidity output 24 V AC DC power Pt10...

Page 17: ...sor temperature humidity sensor models IMPORTANT Use isolated transformer to supply 24 V AC power Single Neosensor must be powered by a single 24 V AC transformer If the multiple Neosensor or a Neosen...

Page 18: ...wing Use a controller with low pass filter 40 dB or higher removal ratio in normal mode that receives signals from Neosensor For insufficient removal ratio provide an isolator on the controller input...

Page 19: ...ration Neosensor is factory calibrated and does not require field calibration right after installation However field calibrate Neosensor if a shift in the output due to aged deterioration is found For...

Page 20: ...ademark of Azbil Corporation in Japan or in other countries Specifications are subject to change without notice Building Systems Company http www azbil com Rev 2 0 Sep 2015 AB 7050 J AI 7050 Rev 3 2 P...

Reviews: