
11-1
Chapter 11. Maintenance and Troubleshooting
11 - 1 Maintenance and Troubleshooting
z
Cleaning
If the device is dirty, wipe it with a soft, dry cloth.
Never use an organic solvent such as thinner or benzene.
z
Parts replacement
Do not replace parts.
The CLOCK and MOTOR blocks can be replaced.
For the replacement method, see the user’s manual included with the replacement
block.
z
Replacement of the CLOCK block
Replace the block with Azbil’s replacement CLOCK block (model No. 84501420-
001),
following the instructions in the user’s manual included with the replacement
CLOCK block.
When discarding the removed CLOCK block, please dispose of it appropriately in
accordance with the instructions in the user's manual.
Handling Precautions
•
Wait for at least 10 minutes after turning off the power to the C7G and all
connected devices before replacing the block.
•
A special tool for replacement that comes with the replacement CLOCK block
and a screwdriver are needed to remove the block. Have a suitable screwdriver
on hand.
•
Be sure to set the date and time after installing the new block.
z
Replacing the MOTOR block
Replace the MOTOR block with Azbil’s replacement MOTOR block (model No.
84501421-001),
following the instructions in the user’s manual included with the replacement
MOTOR block.
When discarding the removed MOTOR block, please dispose of it appropriately in
accordance with the instructions in the user's manual.
Handling Precautions
•
Wait for at least 10 minutes after turning off the power to the C7G and all
connected devices before replacing the block.
•
A special tool for replacement that comes with the replacement MOTOR block
and a screwdriver are needed to remove the block. Have a suitable screwdriver
on hand.