Hardware Installation Guide
42
BBM Specifications
Mechanical
Module Dimension (W x H x D) : 148 x 128 x 244 mm
BBM Connector
2 * 10 box header
Input Voltage
+3.6VDC
On Board Battery Capacity
2000MAH (2*1000MAH)
Installation
Make sure all power to the system is disconnected.
Connector J5 is available for the optional battery backup module. Connect the
BBU cable to the 12-pin battery connector on the controller
Integrators may provide pre-drilled holes in their cabinet for securing the BBM
using its three mounting positions.
Battery Backup Capacity
Battery backup capacity is defined as the maximum duration of a power failure for
which data in the cache memory can be maintained by the battery. The BBM’s
backup capacity varied with the memory chips that installed on the external RAID
controller..
Capacity Memory
Type
Battery Backup duration (Hours)
128MB DDR
Normal (27mA)
74
128MB DDR
Low Power (18mA)
111
Summary of Contents for Yotta Sport
Page 1: ...Yotta Sport RAID Subsystem Hardware Installation Guide Ver 1 6...
Page 14: ...Hardware Installation Guide 8 Rear Panel Overview YI 16SA2U4 YI 16SA2F4 YA 16SA2F4p...
Page 15: ...Chapter 1 Introduction 9 YA 16SA2S3p 1 YB 24S32F4 F8 Fibre SAS...
Page 16: ...Hardware Installation Guide 10 2 YB 24S32S3 SAS SAS 3 YB 24S32PE PCIe SAS...
Page 18: ...Hardware Installation Guide 12 20 Power Module 3...