![Axpert MLV-5KW-48V User Manual Download Page 47](http://html1.mh-extra.com/html/axpert/mlv-5kw-48v/mlv-5kw-48v_user-manual_3041275047.webp)
45
Fault code:
Fault Code
Fault Event
Icon on
60
Power feedback protection
71
Firmware version inconsistent
72
Current sharing fault
80 CAN
fault
81 Host
loss
82 Synchronization
loss
83
Battery voltage detected different
84
Different AC input voltage and frequency detected
85
AC output current unbalance
86
AC output mode setting is different
7. Commissioning
Parallel in single phase
Step 1: Check the following requirements before installation:
Correct wire connection
Ensure all breakers in Line wires at load side are open and each Neutral wires of each unit is connected
together.
Step 2: Turn on all of the units and configure LCD program 28 as
2A0 or 2A1 or 2A2
. And then shut down all
units.
NOET:
It’s necessary to turn off switch when setting LCD program. Otherwise, the setting cannot be
programmed.
All the units must use same selection.
Step 3: Turn on each unit.
LCD display of “2A0” selection
LCD display of “2A1” selection
LCD display of “2A2” selection
Summary of Contents for MLV-5KW-48V
Page 1: ...LV 5KVA 48V INVERTER CHARGER Version 1 0 User Manual...
Page 7: ...5...
Page 13: ...11...
Page 40: ...38 Communication Connection...