![Axis T99A12 Installation Manual Download Page 23](http://html.mh-extra.com/html/axis/t99a12/t99a12_installation-manual_3038906023.webp)
AXIS T99A12 Positioning Unit 24 V AC/DC
Connect the cables
1. Loosen the four lid screws (T20) and remove the lid.
1
Input power connector
2
I/O connector
3
RJ45 connector
4
SFP slot for SFP module (SFP module not included)
2. Connect the network (optical fibre and/or RJ45), I/O and power cables. For more
information on different network connectivity options, see
3. Return the lid to its position and tighten the four lid screws (torque 3.0 Nm).
4. Remove the protective cover.
5. Apply power to the product.
23
EN
Summary of Contents for T99A12
Page 1: ...AXIS T99A12 Positioning Unit 24 V AC DC Installation Guide ...
Page 2: ......
Page 3: ...EN FR DE IT ES JA ZH English Français Deutsch Italiano Español 日本語 中文 简体中文 ...
Page 6: ......
Page 30: ...30 ...
Page 54: ...54 ...
Page 78: ...78 ...
Page 102: ...102 ...
Page 126: ...126 ...
Page 150: ...150 ...
Page 165: ...AXIS T99A12 Positioning Unit 24 V AC DC 4 将底盖向后倾斜至其终端位置 然后拧紧定位单元前面的两颗螺丝 T20 扭矩 3 0 Nm 165 ZH ...