•
Mounting and Installation
•
Installation must be performed by authorized and skilled electricians only.
•
Before mounting and installation, pull the mains plug!
•
The DVB-C/T distribution network must be installed and connected to the equipotential bonding according to EN 60728-
11.
•
Install the device in compliance with the safety regulations defined by the EN 60728-11 standard.
•
Mounting in a 19“ rack
Note:
For 19-inch rack mounting, there must be at least 5 cm clearance in front of and behind the unit.
•
Slide the device into the 19 "rack.
•
Screw the device with four screws (2).
•
Install the device in compliance with the safety regulations defined by the EN 60728-11 standard.
•
Equipotential bonding
•
The device must be connected to the equipotential bonding according to EN 60728-11. Use the equipotential bonding
connection at the device.
•
To connect the outer conductor of the coaxial cable to the equipotential bonding, use e.g. QEW earthing angles or CFA
earth connection blocks at the inputs and output.