8
S
Y
S
TEM C
OMPONENT
S
PRIMAR
Y INSPECTION
INS
TALLA
TION
OPERA
TION
PRIMING
C
ONTR
OLLER
C
OMMISSIONING
MAINTENANCE
REV03121080011217
O
VER
VIEW
Primary Inspection
PRIMAR
Y INSPECTION
Upon arrival, the SFM 1080 Solar Powered Fuel Maintenance System and solar panel must be visually inspected before
installation. Improper handling during shipping may cause physical or electrical problems. Immediately report or note any
damages (also concealed ones) to the shipper.
Checklist
❑
If the packing crate shows signs of damage inspect the SFM 1080 cabinet for damage. Check the entire outside of the
cabinet for damage that could indicate internal mechanical or electrical problems.
❑
Check locking door and hinge operation.
❑
Check pump/motor hardware and all plumbing connections for tightness.
❑
Check all electrical terminals and connections for tightness.