Handling of the Gas Analysis System
6.1.6
Condensate traps
The condensate traps are installed in the measuring gas supply line to the gas analysis system for each
measuring point. Condensate that might accumulate inside the line is collected in the container. After a
regular visual check (daily), the condensate must be emptied manually.
WARNING
An opened condensate trap leads to leakage of gas. This creates a danger of poisoning and explosion.
Close the discharge tap after emptying the condensate traps.
6.2
Replacing a Fuse
WARNING
Electrical voltage is present at the fuse slots. Danger due to electric shock! Prior to replacing fuses,
you must turn off the main switch and thereby disconnect the gas analysis system from the main power
supply.
The fuses are located in the fuse terminals F1 (100–240 V) and F2 (24 VDC).
6.2.1
Specification Fuse F1 (Input Voltage 100–240 VAC)
Standard: IEC/EN 60127 – 2/2
Type: 5 x 20mm
Designation: F 10A L 250VAC
6.2.2
Specification Fuse F2 (Power Supply Unit Output Voltage 24 VDC)
Standard: IEC/EN 60127 – 2/2
Type: 5 x 20mm
Designation: F 5A L 250VAC
6.3
Spare Parts List
The operating safety of the gas analysis system can only be maintained by using original parts or approved
spare parts for every repair operation that is carried out and by adhering closely to the instructions in this
manual and the repair instructions. Spare parts lists are available at Awite.
35