- 8 -
IST0649V1/0
INSTALLATION
Alignment hole
Fixing holes
Insert the calibration accessory BF TEST
(necessary for a correct calibration) in the proper
openings, as shown on the drawing on the side,
keeping the alignment hole on the top.
Install the Receiver in the chosen point and keep it in axis
to the Transmitter as much as possible
For installation onto the wall either reflector and beam need flat cylindrical-head
screws.
Check not to have reflecting bodies, such as glasses, mirrors etc. possibly affecting
the signal, in the area nearby.
MIN 5 MT
MAX 100 MT
Alignment hole
Fixing holes
Insert the calibration accessory BF
TEST (necessary for a correct calibration)
in the proper openings, as shown on the
drawing on the side, keeping the alignment hole
on the top.
Install the Transmitter in the chosen point and keep it in axis to
the Receiver as much as possible
Summary of Contents for BF100 A
Page 13: ...13 IST0649V1 0...
Page 14: ...14 IST0649V1 0...