INSTALLATION RULES

The beam and the reflector must be installed on plane wall, not subject to vibrations or deformation.

Please keep in mind these basic rules:

-

In order to obtain total coverage,

the distance (D) between more
TX/RX couples must not
exceed 15 meters.

-

distance from the walls

must be about  the half
of the distance between
two beams (1/2 D).

-

distance from the ceiling (H)

must be between min. 40 cm.
and max 1 meter.

-

check the possibility of installing

reflectors in axis with beams.

In case of inclination of the roof, install the first beam at about 1

meter from the highest wall and at H distance from the

ceiling.

Install other beams maintaining distance D

between them and distance H from the

ceiling.

Check to have max 1/2 D

distance between the beam

and the lowest side of the

wall from the ceiling.

Check that Receiver and

Transmitters can be
installed on the same axis.

In case of sloping roofs, install the first beam at H
distance from the highest side of the roof.
Install other beams maintaining distance D
between them and distance H from the ceiling.
Check to have the max distance of 1/2D
between the beam and the wall from the
lowest side of the roof.
Check that Receiver and
Transmitters can be installed on
the same axis.

H

Summary of Contents for BF100 A

Page 1: ...R VS ELECTR VS ELECTR VS ELECTR VS ELECTRONICS ONICS ONICS ONICS ONICS Cur Cur Cur Cur Curtar tar tar tar tarolo P olo P olo P olo P olo Pado ado ado ado adov v v v va Ital a Ital a Ital a Ital a Ital...

Page 2: ...self calibration which will be repeated every 2 hours in order to compensate masking caused by dust on lenses and reflector Adjustable sensitivity to get a better intervention threshold according to d...

Page 3: ...3 IST0649V1 0 LED DISPLAY MODULE BF TEST NOT GIVEN WITHIN TRASMITTER COVER BR100 OPTIONAL RECEIVER COVER BF TEST NOT GIVEN WITHIN...

Page 4: ...p u S e v i t a g e n g n i y l p p u S A 0 0 1 R B e l u d o m l a n o i t p o o t n o i t c e n n o c r o f r o o d l a i r e S B Signalling Led Module to visualize the signal during normal working...

Page 5: ...p u S r e p m u j e r i W d e s o l C n e p O g n i y l p p u s V 2 1 g n i y l p p u s V 4 2 7 S y a l e r M R A L A t c a t n o c C N 2 1 n o i t i s o p n I t c a t n o c O N 3 2 n o i t i s o p n...

Page 6: ...d e s o l C n e p O g n i y l p p u S V 2 1 g n i y l p p u S V 4 2 1 P I D 2 P I D 3 P I D 4 P I D E G N A R 5 S n e p o h t i w E G N A R 5 S d e s o l c h t i w 0 0 0 0 5 t m 8 3 1 0 0 0 5 1 t m 5...

Page 7: ...in axis with beams In case of inclination of the roof install the first beam at about 1 meter from the highest wall and at H distance from the ceiling Install other beams maintaining distance D betwee...

Page 8: ...e For installation onto the wall either reflector and beam need flat cylindrical head screws Check not to have reflecting bodies such as glasses mirrors etc possibly affecting the signal in the area n...

Page 9: ...in the Transmitter in order to get the beam units to Calibration mode the green Led in the Receiver will remain on if the signal is received from Transmitter the display Led module will visualize the...

Page 10: ...barrier for few seconds In any case if the module BR100 is used reset can also be made by use of the mechanical key on board In case of fault condition as soon as the beam detects a sudden drop of si...

Page 11: ...d B terminals of beam to concerned A and B terminals on BR100 remote panel BR100 supplying must be separate from beams supplying as a possible short circuit in remote panel supplying may cause a cut i...

Page 12: ...9 open An example of connection using these contacts is shown on side drawing where ALARM contact is set on C NO and FAULT relay is set on C NC R1 is the end line resistence which is usually given wit...

Page 13: ...13 IST0649V1 0...

Page 14: ...14 IST0649V1 0...

Page 15: ...ip switch pag 5 TRANSMITTER pag 6 Terminal board pag 6 Jumper e Dip Switch pag 6 Trimmer pag 6 INSTALLATION RULES pag 7 INSTALLATION pag 8 WORKING MODE CALIBRATION pag 9 WORKING MODE NORMAL pag 10 BR1...

Page 16: ...s r e t e m 0 0 1 x a m e g a r e v o C x a m s r e t e m q s 0 0 0 1 n o i t a r b i l a C r a b d e L y a l p s i d f o e s u y b t i k l a n o i t p O 0 0 1 R B r a b d e l y a l p s i d r o f g n...

Reviews: