ASSEMBLY PROCEDURE
We recommend that you follow the specific order of the assembly procedure. Proceed step by
step and refer to the corresponding pages.
PROCEDURE
PAGE
SECTION
1. Inventory the elements composing your boat,
and learn how to recognise them.
6
CHECK ON UNPACKING
2. Activate valves into inflating position.
7
INFLATION SYSTEM
3. Slightly inflate the main buoyancy tube.
9
INFLATION
4. Finish inflation of the boat to the correct pressure.
8-9
INFLATION / PRESSURE
5. Learn to use the standard equipment.
10
STANDARD EQUIPMENT
CHECK ON UNPACKING
CAUTION
DO NOT USE A SHARP TOOL
The pack must contain a fully fitted out hull, deck and buoyancy tube, plus:
SEASPORT JET
320
400
Repair kit
Owner’s manual *
Foot pump
Spark plug ( x2 )
Water hose connector
Master switch keys
Lanyard
Fuel cap key
* 2 volumes
You can equip your boat with many optional accessories (davit lifting equipment etc.). Ask your
dealer to advise you.
NOTE:
IF YOU WISH TO LIFT YOUR BOAT USING DAVITS CONTACT YOUR
DEALER FOR THE CORRECT LIFTING EQUIPMENT AND FITTING
INSTRUCTIONS
WARNING
USE ONLY AVON AUTHORISED DAVIT LIFTING EQUIPMENT.
SEVERE INJURY OR DEATH COULD OCCUR FROM USING EQUIPMENT
PRODUCED TO AN INADEQUATE SPECIFICATION FOR THE BOAT.
6