20
7.2.3 Cabling Requirements
The installation of the AV-OL-KT-A1 Obstruction Lighting Kit requires the following cables (if
optional cable kit is not purchased):
7.2.4 Factory Configuration
•
L-864 wired with 10ft flying leads (Power cable and Data cable).
•
1 x L-810(F) wired with 10ft flying lead.
•
2 x L-810(F) wired with 25ft flying lead.
•
External Photocell wired with 25ft flying lead.
7.2.5 Installation Recommendation
Note:
The sequence of steps can be adjusted for site requirements.
1. Wire and test the system on ground level.
Conduct a basic functional check to ensure that the lights turn on as expected. See section
7.3 Testing Procedure
for more information.
Reference Point
Cable
L-864 -Top Junction Box
•
Power Cable: 10 AWG 2 Conductor.
•
Data Cable: 18 AWG 4 Conductor.
Top Junction Box - Control Unit
•
Power Cable: 10 AWG 2 Conductor.
•
Data Cable: 18 AWG 3 Conductor.
L-810(F) - Middle Junction Box:
•
Power & Data Cable (x3) = 18 AWG 5 Conductor.
Middle Junction Box- Control Unit •
Power & Data Cable = 18 AWG 5 Conductor.
Photocell - Control Unit:
•
Power & Data Cable = 18 AWG 3 Conductor.