3
English
Installation
Required Tools and Materials
•
#1 Phillips screwdriver
Package Contents
Ensure the package contains the following:
•
Avigilon High Definition Network Video Recorder (NVR)
Server
•
Avigilon Control Center Software Installation DVD
•
Avigilon Control Center Recovery DVD
•
Power Cable
•
USB Keyboard
•
USB Mouse
•
Bezel and Key
•
Rack Sliding Rail Assembly Kit
•
Cable Management Arm Assembly Kit
Installation Steps
Consult the
Product Information Guide
provided with the server for
relevant safety information before you begin installation.
•
Installing the Rack Rails and Cable Management Arm
on
page 4
•
Connecting Cables
on page 4
•
Installing the Bezel
on page 4
•
Licensing the Avigilon Control Center
on page 5
•
Assigning an IP Address
on page 8
Summary of Contents for 10.0TB-HD-NVR
Page 4: ...English ...
Page 26: ...Français ...
Page 48: ...Español ...
Page 70: ...Italiano ...
Page 92: ...Deutsch ...
Page 114: ...Português ...
Page 133: ... 9 28 11 Avigilon Corporation ...