EN
3.2. RCD test
1. Insert the plug into the
power outlet.
2. Press the «RESET» button,
the indicator light turns red.
3. Press the «TEST» button,
the indicator light turns off.
4. Press the «RESET» button,
the indicator light turns red.
The RCD works properly.
3.1. Site selection
Clean the place
A level place
A place with an awning
WARNING :
Before proceed to installation your spa, please make sure that the future
location meets the following conditions :
•
A level place in order to avoid any defect, hernia or leakage.
•
Wide enough to support the pool and its pump unit.
•
Able to support more than 500 kg/m².
•
Sheltered from the sun and bad weather.
•
Clean and free from sharp objects.
•
Devoid of aggressive vegetation on the ground.
Failure to comply with these rules may result in property damage or personal injury.
3. INSTALLATION
WARNING: The RCD plug must be tested before each use..
Do not use if RCD test fails and see chapter 6.1.
Grounding
You are recommended to use the services of a qualified electrician to ensure that the
spa is electrically grounded by using a copper conductor of at least 2.5 mm² cross
section.
WARNING :
Spa installed on inadequately level surfaces are subject to leaking. forming irregulari-
ties or collapses. which can result in properly damage or serious injury for those in or around the spa
area!
CAUTION :
Please choose your set-up area carefully as lawn and other desirable vegetation
undereath the ground cloth (if applicable) wil die. furthermore, try to avoid setting the ground cloth in
areas prone to aggressive plant and weed species, as they may grow trough the ground cloth.
3.3. Assembling
2) Extend the liner to the chosen area.
3) Add the foam wall segment with the
three holes in it for connection to the
base liner.
4) Adjust the 8 segments until they form
a perfect round shape. Then, ensure
that the holes for the outer liner connec-
tion and the holes in the foam wall are
still aligned.
5) Install the connecting hose on the
liner.
8) When installed at corner, push PE
foam inward sothat the coat can be
installed in place..
10) Smooth the liner all around the SPA
to ensure a good fit.
6) Insert the inner liner of your spa.
7) Locate the place where the two
zippers are aligned, connect them first.
1) Choose a flat and level location.
3. INSTALLATION
9) Make sure that the zippers of the
liner and outer liners are aligned before
zipping them up.
11) Connect the unit pump to the pool
using the 3 connectors to screw. Ensure
the icons on the pump and the pool
match up
12) Insert the cartridge into its filter
holder and then screw on the suction
fitting inside the basin.Cartridge location
as shown.
The number of persons required for installation: 1 adult at least.
10 minutes for site preparation and water filling.
8
9