D Installation Guidelines
Determining the Location for the Base Units
57
Installation and Use
8
Repeat Step 7 until all of the Avaya 3810 Wireless Telephones are included
in an area covered by the base units.
9
After all of the Avaya 3810 Wireless Telephones are covered on your floor
plan, perform one of the following steps:
— If you have one to three base units, install each base unit at least five
feet apart in the selected location. Be sure to install each base unit as
high as possible so it clears nearby objects (for example, office
cubicles and file cabinets). This grouping of base units is referred to as
a cluster.
— If you have four or more base units:
a
Install three of the base units in the selected location, with each base unit
being five feet away from another base unit. Be sure to install each base
unit as high as possible so it clears nearby objects (for example, office
cubicles and file cabinets). This grouping of base units is referred to as a
cluster.
b
Select a location that is at least 30 feet away from the cluster, and install
another cluster of up to three base units. Within this new cluster, make sure
each base unit is five feet away from another base unit. Be sure to install
each base unit as high as possible so it clears nearby objects (for example,
office cubicles and file cabinets).
c
Repeat Step b until all of the base units are installed.
When you are finished determining the location for the base units, install the
base units and perform a test call from each handset. Be sure to walk to all areas
where the handset will be used so you can determine whether the voice quality is
acceptable.