5. Product Installation Requirements

This chapter introduces the basic requirements for the installation of the CR OR

series, including structural requirements, electrical requirements, and computer

system requirements.

5.1 Structure Requirements

• 

Lifting structure requirements: The truss load-bearing design should be based on

the actual display weight, and a safety coefficient of 5-7 times should be applied

to prevent unsafe risk due to insufficient load-bearing capacity of the truss. The

same safety coefficient shall be applied to other lifting devices.

• 

Note: Each CR OR series cabinet weighs less than 7kg. per cabinet.

• 

Ground requirements: The installation position of the display screen requires the

ground surface is flat and hard without slope. The ground easily to sunken is not

proper for installation.

• 

Stacking requirements: AVA LED Company provides customers with supporting

floor stacking brackets to quickly install the display anytime, anywhere. The floor

stand is set in units, and multiple sets can be quickly combined to form a large

stacking frame.

5.2 Electrical Requirement

• 

Power supply: working voltage is 200-240VAC, 50-60Hz, main power cable size

is 3×2.5mm² , maximum safety current of cabinet power connector is 16A, and

the number of cabinets one main power cable carry is as 16 pcs.

• 

Power distributor cabinet requirements: The power distributor cabinet has a surge

protection switch. Each power output interface has a circuit breaker. The

maximum current of the interface is 20A, and its total power consumption shall

be over 1.5 times the total power consumption of the display.

• 

Grounding requirements: All parts of the power distribution system must be

grounded to prevent static electricity from harming the human body and causing

damage to the electronic components of the display itself.

5.3 Computer & Control Software Requirements

• 

Computer configuration requirements: The computer must ensure smooth

playback of high-definition video; CPU, graphics card, memory card and other

accessories have medium-to-high performance requirements. The 

can display 1080P HD images, and the discrete graphics card has HDMI or DVI

output interfaces.

• 

Computer system requirements: WindowsXP, Win7, Win8, WIN10; supporting

software: Media Player (MediaPlayer), ultimate decoder (finalcodecs), office

software.

• 

LED display setting software: the latest version of NovaLCT-Mars.

5. Product Installation 

Requirements

Chapter - 5

Summary of Contents for CR OR 500x500 Series

Page 1: ...User Manuel CR OR 500x500 RENTAL SERIES User Manuel...

Page 2: ...tact us according to the contact information in the manual We will try our best to solve this problem We sincerely appreciate your suggestions and improve as soon as possible all photos are similar an...

Page 3: ...e Precise Installation Support Snap Locking system with Magnetism Locating System help one person to install and disassemble within few seconds Supports Various Installation Form Factor Hanging Stacki...

Page 4: ...2G7 043H 2 3 H 0 2A 88242 H 630 A 3424 0 H 04439 I0 2 D4 JKLF 34 4E E M 3N O73 30 2 G 0 0 2 P 73 42 G83 67338 73 0I20 2 24 3 70 QRH 0 9 73 CD3 0 3 2 4 0880 2 24 G 30 3 70 QR SE T D UV 02 0B3W 8D3 D 3...

Page 5: ...nstalled must be flat and smooth Console should be used in the installation area Security Tips CR OR series are in line with international safety standards and information technology equipment safety...

Page 6: ...hould be less than 90 Dustproof Do not place the display in a dusty environment and clean the surface of the display regularly Dehumidification Do not adjust the screen directly to the maximum brightn...

Page 7: ...disassembling the CR OR series products pay attention to the corners of the cabinet do not be impacted remove or install the protective angle of the cabinet in time and place the anti static carpet o...

Page 8: ...working voltage is 200 240VAC 50 60Hz main power cable size is 3 2 5mm maximum safety current of cabinet power connector is 16A and the number of cabinets one main power cable carry is as 16 pcs Power...

Page 9: ...Signal Output Input signal interface is the RJ45 interface These two interfaces are independent of input and output After the signal is connected the system receiving card will automatically recognize...

Page 10: ...e strictly differentiated between input and output When cascaded the output interface of the cabinet is connected to the next cabinet input 3 Per Main Cable Connection max 16 cabinet as shown in Pictu...

Page 11: ...and the cabinet As shown in upside Picture the CR OR series cabinet consists of four modules The cabinet size is 500 500mm Description of the accessories on the cabinet 1 Door Lock 2 Handle with hangi...

Page 12: ...16A as shown in Picture 6 1 In the Picture 1 is the aviation head connected to the cabinet and 2 is the mains open We will provide different open according to different countries Picture 6 1 Main Pow...

Page 13: ...nting Accessories Chapter 6 Fly Bar Lift the display when lifting as shown in Picture 6 5 For holding the truss Picture 6 5 Fly Bar Plate Screw 2 Cabinet combined as shown in Picture 6 6 Picture 6 6 P...

Page 14: ...et Signal Cable Connects the signal between the cabinet and the cabinet and exceeds the five types of network cables as shown in Picture 6 4 Picture 6 5 Cabinet Signal Cable Picture 6 3 Cabinet Power...

Page 15: ...nt and back of the shown in Picture 7 1 Picture 7 1 Processor Picture 7 2 Multiplayer Multiplayer Receivers and Multiplayer the DVI video signal and sends the video data to the receiving card through...

Page 16: ...trol software installed on the computer can set the display parameters display brightness adjustment and other functions The software interface Use Armour Series receving card is shown in Picture 7 3...

Page 17: ...alation 1 First wear anti static gloves and operate with more than one person 2 Take off the cabinet from the flightcase in a slowly and gentle way and unwrap the PE package and press the automatic pr...

Page 18: ...1 Picture 10 2 Picture 10 1 Fly Bar Preparatory Work 1 Select the installation area of the CR OR Series display and enclose it with a safety warning band Non workers should not enter without permissio...

Page 19: ...Rental Screen Floor Instalation The floor where the products will be installed must be smooth and flat if you want to diffrent frame designed you can checking Accessories List...

Page 20: ...and conduct pre testing to ensure that there is no abnormality before installing 10 2 1 Power Distribution Cabinet Each CR OR Series display requires a power distribution cabinet Samsung provides cust...

Page 21: ...length of less than 70m Remarks When the transmission distance is greater than 70m it is possible to transmit data by optical fiber and the longest distance is 20 kilometers Cabinet signal cable used...

Page 22: ...ool Kits Chapter 11 Adjustable Wrench conventional Plastic hammer Allen key M3 is used to open the power cabinet M8 is used to fix the connecting piece Screwdriver medium size Cutting pliers conventio...

Page 23: ...up as shown below 2 The lock lever is pushed up into position and the lock bar lock lever is as shown below 3 After Click Move the handle to the inside according to the arrow of the cabinet so that t...

Page 24: ...he lock lever handle according to the UNLOCK direction of the cabinet to the point where it cannot be Initial state When the cabinet is installed the position of the upper right lock and than push the...

Reviews: