AUX-DC inverter ARV outdoor unit individual series technical manual
117
Calculate the critical thickness through following steps, and take necessary actions.
1) Calculate the refrigerant charge volume A, A= factory charge additional charge volume
2) Calculate the indoor area volume (B) (as the minimum volume)
3) Calculate the refrigerant thickness,
A/B ≤ critical thickness 0.3kg/m
3.
Note:
In winter, supply power 8 hours in advance for initial operation so that crankshaft case can be preheated
in advance.
In winter, after main power supply is interrupted for 8 hours, conduct trial operation again only after 2.5
hours of power-on.
Summary of Contents for ANB66FVAMT
Page 1: ...AUX DC inverter ARV individual series 1 Technical Manual DC Inverter ARV Individual Series ...
Page 3: ...AUX DC inverter ARV individual series 3 ...
Page 19: ...AUX DC inverter ARV outdoor unit individual series technical manual 16 ...
Page 21: ...AUX DC inverter ARV outdoor unit individual series technical manual 18 ...
Page 96: ...AUX DC inverter ARV outdoor unit individual series technical manual 93 ...
Page 113: ...AUX DC inverter ARV outdoor unit individual series technical manual 110 ...
Page 127: ...AUX DC inverter ARV outdoor unit individual series technical manual 124 ...