![AutoPatch Half-Y User'S Reference Manual Download Page 13](http://html1.mh-extra.com/html/autopatch/half-y/half-y_users-reference-manual_3022645013.webp)
1.4 Connecting the Vertical Interval Sync Signal
The sync processor allows switching to occur during the
vertical interval. The sync assembly can utilize a master sync
signal, blackburst, or any genlocked video source.
To use a video signal as the sync signal as well as a usable
input signal, split the signal and attach it to both the sync
connector and a video input connector. The sync connector is
the BNC plug next to the power switch on the rear of the
enclosure. See figure 1.6.
1.5 Connecting and Applying Power
The power connector for the provided power cord is next to
the power switch on the rear of the enclosure. The voltage
requirements for the enclosure are as follows: 100 - 250 VAC
at approximately 1.6 Amps for 50/60/440 Hz, or 120 - 300
VDC at approximately 1 Amp. The power supply is universal
and automatically adjusts to the proper voltage setting within
1-4
Chapter 1
Left
GND
Right
Direction
Signal
Input
Signal
Input
GND
Left
GND
Right
Signal
Output
Signal
Direction
Signal
Output
GND
GND
Direction
Signal
Input
GND
GND
Signal
Output
Signal
Direction
GND
Input
Output
figure 1.5 Single-ended stereo and mono connections
Single-Ended Stereo Input
Single-Ended Stereo Output
Single-Ended Mono Input
Single-Ended Mono Output
figure 1.6 Rear enclosure, CPU side
Power Connector
Power Switch
Vertical Interval Sync Connector
DB-9 Port