19
The BCT-
460DTNA will
monitor the
starter current
and voltage while
the engine is
cranking.
The BCT-
460DTNA will use
the logged data
to determine the
cranking current,
cranking voltage,
cranking time, and
cranking RPM
If the engine
starting RPM was
detected, the BCT-
460DTNA will ask
how many cylinders
the engine has
to determine the
starting RPM. If it
does not then the
BCT-460DTNA
will ask the user to
repeat the test.
When the starter
passes the user
then can proceed
to the alternator
cable voltage
drop test.
POWERNET (STARTER TEST)
Press the Start
key to begin the
test. The unit
will take some
preliminary
measurements.
Turn the key to
the run position.
Wait for the ECU
to power up.
Start the
Engine
If the starter fails
the user will be
asked to make a
repair.
After repair has
been made the
test will cycle
back to the
starting battery
pack test.
The BCT-460
DNTA will ask
if the vehicle
cranks.