background image

Dimensions of fixtures are approximate and may vary ± 6mm (1/4”). Structure measurements must be verified against the unit to ensure proper fit.

Product images and specifications are for illustrative purposes only, product design may vary.

Installation Manual

ASR1202-OO *** Valve Rough-In

5

1

2

3

1

2

3

Test the Handle/Valve:

 

Water temperature will decrease when you rotate 

clockwise, and water temperature will increase when you 

rotate counter clockwise.

CLEANING STOP FILTERS

Removing the stop filters:

 

Using a wrench, take out both of the 

Stops (1)

 by rotating 

them counter-clockwise.
Remove 

Filter (2)

 and 

Valve (3)

 and check for any debris 

or build up.
Use clean water to rinse and clean 

Filter (2)

.

Installing the stop filters:

  

Slide 

Filter (2)

 on to 

Valve (3)

. Then thread it to the valve 

body. 
Use a wrench to tighten the 

Stops (1)

 to the valve.

3A.

4A.

4B.

Thermostatic Valve Cover Plate and Handle Installation

)

Tempature Lock;

must be pushed.

3A.

4A.

4B.

CAUTION! 

If you need to adjust temperature more 

than 38°C (100°F), then you need to press 

the override button and rotate it counter 

clockwise. It should not be possible to turn 

the stem further counter-clockwise.

REQUIRED

REQUIRED

Testing Handles and Replacing and Cleaning Stop Filters

Installing Cover Plate:

Carefully install the 

Trim Plate (1)

, make sure to keep the 

Trim Plate (1)

 tight against the wall.

Configuring the Cartridge:

Before installing the handle and the rest of the trim, 

ensure the thermo cartridge is positioned correctly. Verify 

that the line etched on the top of the 

Plastic Body (1)

 of 

the cartridge lines up exactly with the black line on the 

brass 

Boarch (2)

 as you are looking down on it.  

(See Figures D2. and D3. on the left)

Installing Volume Control Handle:

 

Install 

Plastic Washer (4)

 on diverter. Install the 

Volume 

Control Handle (1)

. Use the 

Allen Key (9)

 to tighten the 

Handle Set Screw (3)

, then insert 

Set Screw Cap (3)

.

Installing Thermostatic Handle:

 

Install 

Plastic Washer (5)

 on the thermostatic mixer. 

Install the 

Thermostatic Mixer Handle (6)

, so that the 

safety stop override button is at the 9:00 position. Use 

the 

Allen Key (9)

 tighten the 

Handle Set Screw (8)

, then 

insert 

Set Screw Cap (7)

.

2C.

2D.

2E.

Thermo Cartridge Calibration Area

D2.

D3.

CAUTION! 

Please check that the marked line on 

the thermostatic cartridge points to the 

rectangle notch on the plastic parts, if not, 

please rotate the brass part. Then install 

the handle.

Marked Line & Groove

MUST ALIGN

1

2

1

2

3

6

9

4

10

5

11

8

7

1

2C.

2D.

TOP VIEW

(1)

(2)

Plastic Body

Boarch

Summary of Contents for ASR1202-OO

Page 1: ...mate and may vary 6mm 1 4 Structure measurements must be verified against the unit to ensure proper fit PRODUCT SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE 2 Way Shared Thermostatic Shower Valve Installation Manual Model ASR1202 OO Valve Rough In Installation Manual ...

Page 2: ...TRIDGES TO PREVENT DAMAGE Keep receipts proof of purchase and place of purchase for this product The receipt is required should it be necessary to request warranty parts MAINTENANCE CARE FOR YOUR AURA PRODUCTS To clean your faucet or accessory when necessary wash with a nonabrasive wet soapy cloth Then wipe dry with a soft towel or cloth Do not use any abrasive chemical or corrosive powders deterg...

Page 3: ...ctive Cover 1 2 Screw AP120 200 4 3 Valve Box 1 4 Hot Water Limiter AP120 204 1 5 Handle Extension AP120 201 1 6 Diverter Retaining Nut AP120 202 1 7 Diverter Cartridge AP120 111 1 8 Set Screw AP120 203 1 9 Valve Body 1 10 Wall Screw 4 11 Protective Cover 1 12 Retaining Nut AP120 205 1 13 Check Valve AP120 106 2 ITEM DESCRIPTION SKU QTY 14 Thermostatic Cartridge AP120 108 1 15 Plug AP120 102 2 16 ...

Page 4: ... Thermostatic Mixer Handle Cap Handle set Screw Volume Control Handle Plastic Washer Volume Control Escutcheon Plastic Washer Cap Handle Set Screw Allen Key Thermo Escutcheon Trim X X Diagram 1 ATTENTION Please check the thickness making sure the plastic surface does not go beyond the tile surface ATTENTION REMOVE THE CARTRIDGE BEFORE INSTALLATION FLUSH THE HOT AND COLD SUPPLY LINES WITHOUT THE CA...

Page 5: ... clockwise REQUIRED REQUIRED Testing Handles and Replacing and Cleaning Stop Filters Installing Cover Plate Carefully install the Trim Plate 1 make sure to keep the Trim Plate 1 tight against the wall Configuring the Cartridge Before installing the handle and the rest of the trim ensure the thermo cartridge is positioned correctly Verify that the line etched on the top of the Plastic Body 1 of the...

Page 6: ...e 4 in to the valve Use a Allen key to tighten set Screw 5 Using a wrench screw on the Retaining Nut 3 clockwise Put on the Hot Water Limiter 2 Rotate Thermo Escutcheon 1 to the valve clockwise 5A 5B 6A 6B CAUTION Do not over open when the stop reaches the maximum opening as it may cause the stop to malfunction REQUIRED REQUIRED REQUIRED REQUIRED 5A 6A 5B 6B Removing and Installing Thermostatic Ca...

Page 7: ...unit to ensure proper fit Product images and specifications are for illustrative purposes only product design may vary Installation Manual ASR1202 OO Valve Rough In Installation Examples HOT COLD HOTC OLD Open UP Open HOT COLD HOTC OLD Open UP Open HOT COLD HOTC OLD Open UP Open HOTC OLD HO TC OL D Open UP Open 7 ...

Reviews: