GB14
A. Positioning the main mattress body
Put the bed in the flat position.
Place the mattress body (A) on the
mesh base (see fig. 5).
Check the position of the connectors!
Press down with two hands on the
mattress
where
the
mattress
connectors are positioned (see fig. 6).
The mattress base will connect with an
audible click.
B. Connecting the mattress connectors
Connect the cables of the mattress
connectors to the control box
(see fig. 7). Follow the connecting dia -
gram on the underside of the control
box.
C. Connecting the power supply
This transformer has three contact
points for connecting two Royal motor
controls and one AirMassage &
Hotspot control can be connected. In
the case of two AirMassage & Hotspot
controls, the second AirMassage &
Hotspot should be connected to a
separate transformer.
fig. 5
fig. 6
fig. 7
fig. 8
Euro, UK or USA plug
3866_bw.qxp:63510_Auping_Royal_hot 28-11-2008 11:37 Pagina GB14
Summary of Contents for AirMassage & Hotspot
Page 24: ...NL 22 3866_bw qxp 63510_Auping_Royal_hot 28 11 2008 11 37 Pagina NL 22...
Page 66: ...FR22 3866_bw qxp 63510_Auping_Royal_hot 28 11 2008 11 37 Pagina FR22...
Page 88: ...D22 3866_bw qxp 63510_Auping_Royal_hot 28 11 2008 11 37 Pagina D22...
Page 122: ......
Page 150: ...ES22 3866_bw qxp 63510_Auping_Royal_hot 28 11 2008 11 38 Pagina ES22...