![AUMA SG 04.2 Operation Instructions Manual Download Page 23](http://html1.mh-extra.com/html/auma/sg-04-2/sg-04-2_operation-instructions-manual_3016497023.webp)
4.
Set switching point (yellow LED is brightly illuminated) by turning clockwise.
Figure 20:
➥
If the LED is only dimly illuminated, the switching point has not yet been reached.
➥
Once you have turned too far, the yellow LED goes out again.
➥
The setting disc should be positioned in the middle between illumination and
going out of the yellow LED.
5.
After setting end position CLOSED: Hold setting disc tight and tighten both
screws [1].
6.
Operate valve from end position.
7.
Approach end position CLOSED once again and check setting (yellow LED
must be illuminated).
Verify end position
OPEN
8.
Operate valve exactly to end position OPEN.
➥
If the green LED is illuminated, end position detection OPEN has been correctly
set.
➥
If the green LED is not illuminated or only flickering, end position detection has
to be set again. Proceed as follows:
Set end position OPEN
9.
Loosen screw [3] and remove setting disc [2].
Do not lose parallel key.
10. Loosen screw [4] at the bottom of the setting disc.
Figure 21: Bottom of the setting disc with lateral dial
11. Adjust dial to different swing angle: approx. 3 – 4° smaller than actual end pos-
ition.
12. Tighten screw [4] again.
13. Fit setting disc [2] and secure with screw [3].
14. Approach end position CLOSED once again an check setting (LED must be il-
luminated).
23
SG 04.2 – SG 10.2
with actuator controls MEC 03.1
Commissioning