Subject: Ultimate Chuck Install & Training Checklist
Doc. No. FM 9-112
Rev.C
__ If drawtube stroke and resulting jaw stroke is less than .050" more than the adjustment pitch, you need to use
half pitch base jaws for hard jaw applications and to take care that you always setup to grip in the first part of the
jaw stroke. ___ Chuck lubrication
Lubricate every 24 hours of operation with two shots of KO5 grease per fitting.
Lubricate with chuck in the fully open (jaws away from centerline) position only.
Fully stroke chuck (10) times after lubricating to distribute grease to internal components. Fully
stroke the chuck 5-10 times after each 50 parts and at the start of the shift
Clean and lubricate jaws whenever jaws are changed, or once per eight hour shift.
If ATS supplied the hydraulic cylinder, demonstrate the stroke control system. Spindle should not turn
under power unless a part is chucked and jaws are not fully open or fully closed. If ATS cylinder, note
here if lathe has no such system and advise customer management you could not interface.
Name of
person advised:
_________________________
___
Boring soft jaws. Manual section 4.3
___
Train customer on the features and benefits of the chuck (many operators don’t know).
___
Train on the types of jaws available and typical applications (how to use the jaw catalog). ___
Review recommended spare parts list.
Installers Evaluation:
___
Rate your opinion of the customer’s grasp of the training, and his potential to operate and maintain the
product properly. (1-10)
Summary of Contents for ULTIMATE CHUCK UC2
Page 12: ......
Page 13: ......
Page 15: ......
Page 25: ......
Page 26: ...ATS Systems Formerly SMW Systems Ultimate Chuck UC2 Spare Parts List 3 16 2007 Page 1 of 19...