Chapter 2 Installation Essentials
Rules for product unpacking, inspection, preparation before use, and storage
.
2.1
Unpacking and inspection
1. Unpack the AC inverter power supply, please check the attached accessories,
Accessories
:
1.
User Manual
2.
Warranty Card
3.
Power cable
2. The package of this product is protected by pearl cotton. If the customer receives a
damaged box, please check the appearance of the machine for deformation, scratches, or
damage to the panel.
3. If there is damage, please notify our company or its distributor immediately. And please
keep the packing box and pearl cotton. Our service center will help you repair or replace the
new machine. Do not return the product immediately without notifying our company or its
distributor.
2.2
Check before use
1.
Before the input power supply wiring, the power required for this machine, all switches
should be placed in OFF position. Please connect the wiring according to the logo.
2.
Please make sure all the wiring is correct before starting.
3.
The model will be displayed on the screen when the computer is turned on, and
the CPU will call the last setting value before shutting down, because the setting value has
been memorized in the EEPROM of the machine after leaving each setting state .
Input voltage requirements and options
APS series AC variable frequency power supply uses single-phase 220V power
supply. Before turning on the power switch of the machine, please confirm the choice of
power supply. At the same time, you must use a regular fuse (already equipped at the
factory). The specification of the fuse has been marked on the back panel of the instrument.
Before replacing the fuse, the input power must be turned off to avoid danger.
Summary of Contents for APS-4000 Series
Page 18: ......