4.1
Before starting
– With the lighting tower standing level, check the
engine oil level and top up if necessary. The oil
level must be between the min and max levels on
the engine oil level dipstick.
– Check the coolant level in the expansion tank of
the engine cooling system. The coolant level must
be between the min and max levels. Add coolant
if necessary.
– Drain any water and sediment from the fuel pre-
filter. Check the fuel level and top up if necessary.
It is recommended to fill the tank after the day’s
operation to prevent water vapor in a nearly empty
tank from condensing.
– Drain leaking fluid from the frame.
– Check the vacuum indicator of the air filter. If the
red part shows completely, replace the filter
element.
– Press the dust evacuator of the air filter to remove
dust.
– Check the lighting tower for leakage, tightness of
wire terminals, etc. Correct if necessary.
– Check that circuit breaker 2Q1 is switched off.
– Check that the fuses have not tripped and that the
emergency stop is in the OUT position.
– Check that the load is switched off.
4.2
Starting and stopping the
engine
4.2.1
Before the engine is started
4.2.2
Electric start-up procedure for
the lighting tower
Connect the current by means of the Battery Isolator
Switch (1) placed inside the lighting tower and
accessible through the rear door.
In your own interest, always strictly
observe all relevant safety
instructions.
Do not operate the lighting tower in
excess of the limitations mentioned
in the Technical Specifications.
Local rules concerning the setting
up of low voltage power installations
(below 1000 V) must be respected
when connecting site distribution
panels, switch gear or loads to the
lighting tower generator.
At each start-up and at any time a
new load is connected, the earthing
and protections (GB trip and earth
leakage relay) of the lighting tower
must be verified. Earthing must be
done either by the earthing rod or, if
available, by an existing, suitable
earthing installation. The protective
system against excessive contact
voltage is not effective unless a
suitable earthing is made.
!
Carefully follow all the starting
instructions in the engine's Manual
as well as those contained in this
Manual.
1
Summary of Contents for SK 160 SA 1
Page 1: ...User and maintenance manual for lighting towers English QLT H40 Pd S2 APP 403D 11G ...
Page 2: ......
Page 53: ... 53 9 2 Average illumination versus distance QLT 10m 200 Lx 25m 100 Lx 35m 50 Lx ...
Page 54: ... 54 9 3 Dimension drawing ...
Page 56: ... 56 ...
Page 57: ... 57 Circuit diagrams ...
Page 58: ... 58 A1 23591B2 Power circuit ...
Page 62: ... 62 A1 23591B2 Trolley connector ...
Page 63: ... 63 A1 23581B2 Lamps ...
Page 64: ... 64 ...
Page 65: ... 65 Parts list ...
Page 87: ... 87 MARKINGS STANDARD ...
Page 93: ......
Page 94: ...Printed in Belgium 07 2012 2954 4960 03 www atlascopco com ...