♦
Place the hydraulic demolition cutter with the broad
back of the cutter jaw (double) on the assembly
rack so that the pin lies in the semi-shell of the
assembly rack.
♦
Secure the carrier such that it cannot move
unexpectedly.
♦
Push the two holders (G) on one side of the
assembly rack on the cutter jaw until they contact
the cutter jaw (double).
♦
Secure the pin by fitting the Allen screw (H).
♦
Secure the holders by fitting the Allen screws (I).
♦
Push the two holders on the other side of the
assembly rack until they contact the cutter jaw
(double).
♦
Secure the pin by fitting the Allen screw (J).
♦
Secure the holders by fitting the Allen screws.
♦
Tighten all Allen screws with the tightening torque
required (see chapter
Bolted
connections/Tightening torques
).
1.
2.
H
G
I
J
3.
♦
Disassemble the Allen screws (K) from the cover.
K
The bolt cage has two Allen screws.
29
© 2015 Construction Tools GmbH | No. 3390 5141 01 | 2015-11-16
Original instructions
INSTALLATION
CC 1700 U, 1700 S