4
Is there ANY GSM
signal?
Installation and Commissioning
Note: It is important that you verify that there is a mobile signal at the point of
installation before you install the sensor.
The installation is carried out following the flowchart shown in Fig 1. Each step is
clarified in the text below:
Fig 1
No
Poor
No
No
Fit collar and seal,
adjust probe to length
and fit to tank
Activate the probe
and observe
indicator lights
Drill 3 holes
(use template)
Does tank have pre
moulded mount or
holes?
Check information
has reached base
Abandon install
Measure and record tank
height and tank volume.
Dip and record depth of
fuel in mm
Fit extended antenna
kit
Determine suitability
of tank and fuel